Filter Search


Energy,-Power-and-Electrical


Location Summary Deadline
India Discharge Rod / Earthing Pole Assembly .#* Discharge Rod / Earthing Pole Assembly Of 25 Kv Ac Traction With Cable And Top , Bottom Cla mp As Per Rdso Specification No.eti/ohe/51 (9/87)rev-1 (10/92). [ Warranty Period: 30 Months After Th e Date Of Delivery 2025-09-11
India Electronic Control Module .#* Electronic Control Module, Sil Drg. No. 09872401 Or Rasika Drg. No. Gg17-ad-127-00. Make: sil/rasika Or Equivalent. [ Warranty Period: 30 Months After The Date Of Delivery ] ] 2025-09-11
India Single Pole, 130 Volt Dc M.c.b. 2.5 A .#* Single Pole, 130 Volt Dc M.c.b. 2.5 A To Rdso Spec. No. Spec/e-12/1/04 Of March92 With The amendment No.1 Of June 1993 & Rdsos Drg. No. Skel-3700 Alt. 1 Dated 05.09.94 Alongwith Latest Amen dmentalteration Of Spec 2025-09-11
India Tender Invited For 24 Fiber Armoured Optical Fiber Cable (single Mode) As Per Rdso Specification No. Rdso/spn/tc/110/2020 Rev.0.0 Or Latest. [ Warranty Period: 30 Months After The Date Of Delivery ][quantity Tolerance (+/-): 2 %age , Item Category : Speci 2025-09-11
Germany Rv Disposal Of Street Goods According To The Circular Economy Law For The Years 2026 To 2028 2025-09-11
Germany Electrotechnical Work 2025-09-11
Lebanon The Purpose Of This Deal Is To Purchase Protection Stations That Are Necessary To Maintain Medium Tension Cells In The Main Transformation Stations Type Retrofit Sepam 2000, As Shown In Reference Conditions From The Private Conditions Book, And The Delive 2025-09-11
Spain Supply, Installation, Testing, Validation And Implementation Of 5gntn Emulation Infrastructure 2025-09-11
India Design, Construction, Testing, Commissioning And Operation &ampampampampampampampampamp Maintenance Of Infrastructure Works At Jodhpur Pali Marwar Industrial Area (jpmia)- Phase A Under Delhi Mumbai Industrial Corridor (dimc) On Epc Basis 2025-09-11
Czech Republic Opava, Praskova Intersection - Replacement Of Traction Poles And Overhead Line Network 2025-09-11
Whats app