Filter Search


Energy,-Power-and-Electrical


Location Summary Deadline
France Public Market For Landfill Of Low -voltage Networks, Public Lighting And Electronic Communications Chemin De La Marianne And Chemin Creux, Rue Du Bois Lambert For The Town Of Goupillières (78) 2025-08-28
Germany Heizanl. U. Center. Water Heating 2025-08-28
Japan Electricity To Be Used In Nagoya Legal Affairs Bureau, Etc. Contract Power 1,184kw, Estimated Volume Of Electricity 2,079,063kwh 2025-08-28
India Jumper Cable Support Link Assembly .#* Jumper Cable Support Link Assembly (stainless Steel) As Per Drawing No. Lwscwac/eo g-7-1-006/col I, Alt-a. Packing Instruction : Spi220 [ Warranty Period: 30 Months After The Date Of D elivery ] ] 2025-08-28
India Disconnector Assembly Kit .#* Disconnector Assembly Kit Suitable For Lightening Arrestor Of 42kv As Per Rdso Specification no.- Ti/spc/psi/mogtla/0101(02/2015) Or Latest. [ Warranty Period: 30 Months After The Date Of Delivery ] ] 2025-08-28
India Aluminium Impeller For Oil Cooling Blower .#* Aluminum Impeller For Oil Cooling Blower Unit Centrifugal Design For 3-phase Locomotive As P er Rdso Specification No. Rdso/2016/el/spec/0123, Rev. 0 And Drg. No. Rdso/2016/sk-6/el/spec/0123 or Latest With Ref 2025-08-28
Switzerland Museum Building Art Museum Winterthur, Bkp 230 Electrical Installations 2025-08-28
Japan Supply And Demand For Electricity Used At The Nagoya Joint Government Building No. 1 And Other Eight Facilities (high Voltage Power) 2025-08-28
Lithuania (2024dps3) Modular Transformer 8001600 Kva Dynamic Purchasing System 2025-08-29
United States Third-party Energy Efficiency Programs Solicitation - Statewide Career And Workforce Readiness Program 2025-08-29
Whats app