Filter Search


Energy,-Power-and-Electrical


Location Summary Deadline
Germany Extension Schillergymnasium For The Changeover From G8 To G9 2025-06-16
Morocco Installation Work Of Off-grid Photovoltaic Solar Panels At The Ifrane National Park, Ifrane Province, Single Lot. 2025-06-16
Switzerland Tubing Dn 1400 And 1100 2 X 1700 M Conduite Génilac - Jag Sector Work Market 2025-06-16
India Expression Of Interest For Development Of Parts / Assemblies Required For Beml Mining & Construction Equipments, Torque Converter Assy, Steering Clutch Assy, Torque Converter Assy, Steering Clutch Assy, Torque Converter Installation, Main Clutch Assy, P.t 2025-06-16
Japan Electricity Of Public Officebu-ilding(6,600v) Contract : 4,464,179kwh 2025-06-16
Japan Government Building Power (ac 3-phase 3-wire Type, Supply Voltage 6,600 Volts) Expected Energy Usage: 4,464,179kwh 2025-06-16
Germany Pv System, V0208/2025, Delmetal Barracks, Delmenhorst V0208/2025 2025-06-16
-Construction-Of-Office-Building-Cum-Residential-Premises-(with-Electrification)-In-Various-Places.>India -Construction-Of-Office-Building-Cum-Residential-Premises-(with-Electrification)-In-Various-Places.>Construction Work Of New Block Cum Office Building (with Electrification) In Various Places.
Construction Of Office Building Cum Residential Premises (with Electrification) In Various Places.
-Construction-Of-Office-Building-Cum-Residential-Premises-(with-Electrification)-In-Various-Places.>2025-06-16
United States N--maca-install Hotel Generator/upgrade Ele 2025-06-16
Japan Power Supply Contract (ac 3-phase 3-wire Type, Supply Voltage 6,600 Volts) Planned Power Usage 2025-06-16
Whats app