Filter Search


Energy,-Power-and-Electrical


Location Summary Deadline
India Voltmeter Nw72 Net 1 , 0-800v, Ac As Per Rcf Spec Edts 103 Rev-d Amd- 7 .#* Voltmeter Nw72 Net 1 , 0-800v, Ac As Per Rcf Spec Edts 103 Rev-d Amd- 7 [ Warran ty Period: 30 Months After The Date Of Delivery ] [quantity Tolerance (+/-): 5 %age , Item Categor 2025-08-06
Morocco Studies And Replacement Work Of Pn 3040 And 3042 On The Tangier/sidi Kacem Line By Art Structures 2025-08-06
India Cradle Bracket For Fitment Of 4.5 Kw .#* Cradle Bracket For Fitment Of 4.5 Kw 110 V Dc Rectifier Cum Regulator Unit Of Alternator For non-ac Coaches Drg. No. Dy Cee/ws/kgp/tl/30-85 , Alt-1 . [ Warranty Period: 30 Months After The Date O f Delivery ] ] 2025-08-06
India Fielded Magnet Frame (stator) Complete For Emu/memu Traction Motor Type 4601 bx. .#* Fielded Magnet Frame (stator) Complete For Emu/memu Traction Motor Type 4601 Bx. [ Warr anty Period: 30 Months After The Date Of Delivery ] ] 2025-08-06
India Ptfe Type 25 Kv Short Neutral Section Assembly (phase Break) Suitable For 107 Sq mm. Contact Wire And 65 Sq. Mm. Catenary Wire, As Per Rdso Specification No. rdso/ti/spc/ohe/sns/0000/rev. 1 .#* Ptfe Type 25 Kv Short Neutral Section Assembly (phase Break) 2025-08-06
India Hydro Jet Roller Bearing Cleaning Machine .#* Supply, Installation, Commissioning And Testing Of Hydro Jet Roller Bearing Cleaning Machine at Emu Workshop, Avadi As Per The Specification Enclosed And Supplied With The Optional Accessories (1) Oil separato 2025-08-06
India Oil Cooling Unit For Transformer .#* Oil Cooling Unit For Transformer With Aluminium Impeller And Casing Including 30 Kw Motor for Wap -7 & Wag-9 Locos. Specification /drg. No : As Per Rdsos Specn No .rdso 2016/el/spec/0123 Re v.1 [ Warranty Period: 30 Mo 2025-08-06
Germany Germany – Emergency Power Generator – Supply Of Emergency Power Generators 2025-08-06
India Empanelment Of Electrical Contractor For Installation Of Power Line For Lift Irrigation Project For The Fy 2025-26 To 2026-27. 2025-08-06
India Diversion/relocation Of Existing 400 Kv Ppsp-durgapur D/c Transmission Line In Between Tower No. Tl. 426 And 430 (rl -1.0 Km) Under Jurisdiction Of Asansol 220 Kv Substation For Construction Of Flyover By Eastern Railway For Proposed Andal-sainthia 2025-08-06
Whats app