Filter Search


Energy,-Power-and-Electrical


Location Summary Deadline
Argentina Acquisition Of Electrical Materials 2025-06-30
Poland P - Execution Of Projects; Gdansk Branch; Kartuzy; Construction Of Lv Cable Connection For Power Supply Of A Residential Building On Plot 329/1 In Smetowo Chmielenskie.; Kartuzy Rural Area; Smetowo Chmielenskie (village); 2405600 2025-06-30
Poland P - Execution Of Projects; Gdansk Branch; Kartuzy; Construction Of A Low-voltage Cable Line To Supply Power To A Two-unit Residential Building Complex On Plot 986/15, 986/16 In Kielpino.; Kartuzy Rural Area; Kielpino (village); 2405561 2025-06-30
Russian Federation Supply Of Electrical Goods Switches 2025-06-30
Russian Federation Supply Of Electrical Materials 2025-06-30
Poland Rfi Successive Delivery Of Mv Cables In The Period Q2-2025 To Q2-2027 2025-06-30
Poland W - Execution Of Works; Gdansk Branch; Demolition Of The Sn-15kv Surface Network And Transf. Stage And Construction Of The Sn, Lv Cable Network And Transf. Stage According To B/23/069039, P/23/073282/2, P/23/068476/2; Szemud Rural Commune; Koleczkowo (vil 2025-06-30
Azerbaijan Purchase Of Technical Services Of Electrical Systems And Equipment In The Administrative Building Of The Ministry Of Finance During 2025 2025-06-30
Poland W - Execution Of Works; Gdansk Branch; Kartuzy, Replacement Of Switch Disconnector Q-82333 With A Controlled Switch Disconnector Together With A Mv Pole In The Route 05200-20-087500, Palubice, Sierakowice Commune; Sierakowice Rural Commune; Palubice (vill 2025-06-30
Argentina Cold/hot Dispenser Rental Service With Drinking Water Supply - Inevh 2025-06-30
Whats app