Filter Search


Energy,-Power-and-Electrical


Location Summary Deadline
India P/s To 01no. 02kw Dlf Conn. To Rajkumar Kaiwartya S/o Ramkumar Kaiwartya At Pahanda & Dharmendra Koshale S/o Ubhe Ram At Khainda Under Lawan D/c Of (o&m) Dn. Baloda Bazar 2025-08-04
India Circuit Breaker Scavenger Blower Mr, Cab Ventilation And Crew Fan .#* Circuit Breaker Scavenger Blower Mr, Cab Ventilation And Crew Fan (pos No 56.1.69.6 1.69.71 Type- 5) As Per Clw Spec No Clw/es/3/0096 (alt-l) And Abb Document No Hbtb585552r101 3 [ Warr 2025-08-04
India Electrical Arrangement For Upgradation Of Shravanabelagola, Sri Sathya Sai prasanthi Nilayam And Gubbi Railway Station Under Abss 2025-08-04
India Design, Drawing, Modification, Supply, Erection, Testing And Commissioning Of 25kv Ohe For Additional Two Lines On North Side And Extension Of Line No.7 At narkatiaganj Yard, Cut & Connection Of Br.no.322 Between Hir-bru, 2 Nos. Major bridge On Diversion 2025-08-04
India Reconstruction Of Mattuthavani Bus Stand Bus Bay In Madurai Corporation. 2025-08-04
India Supply Of 5 Watt Digital Vhf Walkie Talkie Set Without Keypad And Without Display As Per Spec. No. Rdso/spn/tc/107/2018 Rev.2.0 Or Latest, Sl No.2.3(b). Each Set Will Consist Of: (1) One No. Of 5watt Vhf Set With Compatible Battery+ Battery Charger+ Anten 2025-08-04
Kuwait Event_64001 - Rfq#2150815_spares For Vsd Panel Mfr Leroy Somer 2025-08-04
India Balance Work Of- Extension Of Pcoi Station Building On First Floor Towards Hwh & ndls End Along With Furnitures Etc. 2025-08-04
India Proposed Works For 1.construction Of New Lobby Building At Kalumna In Nagpur division, 2.new 40 Bedded (20 Rooms) Running Room At Cwa Lobby In Nagpur division, 3.new 20 Bedded (10 Rooms) Running Room At Chcr In Nagpur Division, 4.comprehensive Augmentatio 2025-08-04
India Provision Of Over Run Line At Dn 1st Loop And 2nd Loop At Sonnagar Station And bagohi Kusa - Increasing Of Up Long Haul Loop Line At Least Upto 1400 Mtr. For accommodating Long Haul Trains. 2025-08-04
Whats app