Filter Search


Energy,-Power-and-Electrical


Location Summary Deadline
India Fabrication, Galvanizing, Testing, Supply And Delivery Of Different Substation Structures And Matching G.i Bolts, Nuts And Washers At Berhampore 132 Kv Substation, Wbsetcl 2025-09-22
India Fabrication, Galvanizing, Testing, Supply And Delivery Of Different Substation Structures And Matching G.i Bolts, Nuts And Washers At Raghunathganj 132 Kv Substation, Wbsetcl 2025-09-22
India Fabrication, Galvanizing, Testing, Supply And Delivery Of Different Substation Structures And Matching G.i Bolts, Nuts And Washers At Rampurhat 132 Kv Substation And Sainthia 132 Kv Substation, Wbsetcl 2025-09-22
Czech Republic Public Procurement - Vector Analysts 2025-09-22
Czech Republic Public Contract - Work Machine Including Accessories 2025-09-22
India Procurement Of Wire Braided Rubber Hose Connection Pipe With Female Connector On both Sides Threaded Etc. .#* Wire Braided Rubber Hose Connection Pipe With Female Connector On Both Sides Threaded. Spe cification As Per Annexure Attached. [ Warranty Period 2025-09-22
India Procurement Of Smf Battery 12v 150ah With 3 Years Replacement Warranty At Sinp 2025-09-22
Canada Supply And Delivery Of Street Light Standards, Arms And Bases 2025-09-22
India Set Of Connectors And Contacts .#* Set Of Connectors And Contacts As Per Clw Specification No. Clw/es/2/0124 Al t-o Or Latest As Per (1) Plug Size 40, 61 Poles For Socket Contact, Qty-10 Nos. (2) Socket Co ntact Size 12/6 Qty-50 Nos. (3) Receptacles Sizes 2025-09-22
India Cradle Bracket For Fitment Of 4.5 Kw .#* Cradle Bracket For Fitment Of 4.5 Kw 110 V Dc Rectifier Cum Regulator Unit Of Alternator For non-ac Coaches Drg. No. Dy Cee/ws/kgp/tl/30-85 , Alt-1 . [ Warranty Period: 30 Months After The Date O f Delivery ] ] 2025-09-22
Whats app