Filter Search


Energy,-Power-and-Electrical


Location Summary Deadline
Thailand Contracting For Construction/demolition Of Electrical Systems mrs. Saowalak Moon -in address Village No. 1, San Pong Subdistrict, Mae Rim District, Chiang Mai Province c-68-a-acsr.0078.02.1 2025-08-12
Thailand Contracting For Construction/demolition Of Electrical Systems mrs. Wilai Maurison address Village No. 12, Mae Ram Subdistrict, Mae Rim District, Chiang Mai Province c-68-a-a-march 2025-08-12
Thailand Contracting For Construction/demolition Of Electrical Systems mrs. Phanitaphatthaitichai address Village No. 8, Rim Tai Subdistrict, Mae Rim District, Chiang Mai Province c-68-a-a-a-a-marine Number 2025-08-12
Thailand Contracting For The Installation Of 22 Kv Snack Card As Follows -red Light Intersection (ptp2s-02) To The End Of Ban Bueng (bbu2s-03) (both New Types Of Installation) -industrial Estate 7-8-9 (aluminum Repair) 2025-08-12
Thailand Construction Bidding The Construction Of 22 Kv Distribution System, According To The Por. 2 Project, Plan 3 (turnkey) At Nong Samet Intersection-ao Yai Temple (part 2), 7.870 Cyles Of Work-km. 2025-08-12
Thailand Selling By Specific Methods, Damaged Parcels And Scraps Of Memes, Damaged, Various Sizes 1. 1 Rotating Meter, 401 Damaged Phase 2. E. 1 Phase 2 Phase Damaged. 3. Tou Meter 1 Phase Damaged 14 Machines. 4. 3 Phase Meter 4 Cables. Code 1060050107 Damaged 2 D 2025-08-12
Germany Raw And Dismantling Work 2025-08-12
Germany Raw And Dismantling Work 2025-08-12
Tunisia Studies And Monitoring Of The Implementation Of Energy Efficiency Actions On Technical Installations For The Benefit Of 65 Public Establishments 2025-08-12
Germany Raw And Dismantling Work 2025-08-12
Whats app