Filter Search


Energy,-Power-and-Electrical


Location Summary Deadline
India Construction Of Culvert Near 7/10 Madan Sarkar House, Booth No-126, Sandelerbill Gp Under Hingalganj Dev. Block Under Apas Fund 2026-01-05
India High Mast Light At Pather Dabi Tentultala Fp School, Booth No-107, Hingalganj Gp Under Hingalganj Dev. Block Under Apas Fund 2026-01-05
India Led Street Light Install And Repair From Chaitannya Mission To Narayan Sardar House, Booth No-107, Hingalganj Gp Under Hingalganj Dev. Block Under Apas Fund. 2026-01-05
India Diversion /extension And Dismantling Of 6.6 Kv Power Line Of Eastern Part As And When Required Basis Of Quarry Section At Gevra Project For A Period Of 365 Days. 2026-01-05
India Replacement Of Very Old Central Ac Plant By Air Cooled Type Central Air Conditioning System At Risat Building No.52, At Sac Campus Electrical Work. 2026-01-05
India Construction Of District Hospital At Ramganjmandi, District Kota (excluding Cost Of Cement) 2026-01-05
India Supply Of Over All Differential Protection Relay With Ref Protection _ Suitable For 3 Winding_1 No 2026-01-05
India Sr Work For Water Supply Line From E-01 Garden Bore To Exiting Water Sump At Srp Group 17, Chela. Dist.:- Jamnagar. (including Electrification Work)(sor 2024-2025) Sbd (3rd Attempt) 2026-01-05
India Special Repairs To Office Of The Assistant Director, Anti-corruption Bureau Border Unit At Bhuj , Dist :- Kutch.(including Electrification Work) (revised) (3rd Attempt) (sbd) 2026-01-05
India Special Repairs To Outpost And Police Staff Quarter B-03(g+1) At Sanathli, Dist:- Rajkot (including Electrification Work) (2nd Attempt) (sbd) 2026-01-05
Whats app