Filter Search


Energy,-Power-and-Electrical


Location Summary Deadline
India Electrical Work For (i) Augmentation Of Existing Crew Lobby At Bksc & (ii)construction Of New Loco Maintenance Office At Bksc. 2025-05-09
India Carrying Out Zone Works In Zone No. 2-north-ii- Area Situated West Of Road Leading From Block No. 619, 620, Rastriya Vidyalaya & Jatepur Chauraha Including Driver Running Room Junior Institute For P.e. 30.06.2026. 2025-05-09
India Carrying Out Zone Works In Zone No.12-bichhia-iii- Area- Mstc & It's Hostels, Rpf Training Centre, Transit House And Other Service Buildings In This Area Only Under Jurisdiction Of Sse-w-bichhia For P.e. 30.06.2026. 2025-05-09
India Carrying Out Zone Works In Zone No.13 -south-i- Area - Building Including Gm Office, Statistical, Cme, Cptm, Cmd, Pce, Pcste, Cpo, Cpo Canteen, Rpf Barrack, Rail Museum, Rct, Rrb Building, Dy.ce/ga, Cwm/br. And Officers Bungalow No. 6, 7 Etc. From West Of 2025-05-09
India Carrying Out Zone Works In Zone No.14 -south-ii- Area - Stadium, Stadium Rest House, Rly Post Office, Allahabad Bank, Golf Ground, Nursery, Officer Club, Cricket Ground, Rapti, Sharda And Varuna Rest House, South Dispensary, Co-operative Bank, State Bank, 2025-05-09
India Carrying Out Zone Works In Zone No.15 -south-iii- Area - All Residential Buildings And Respective Roads Situated In Stadium Colony, Aami Rest House Alongwith All Small Service Buildings Which Are Not Included In Other Zones Of South For P.e. 30.06.2026. 2025-05-09
India Provision Of Earthing And Bonding To Safety Fencing Along The Track In Igatpuri-bhusaval & Manmad-ankai Section In Bhusawal Division Of Central Railway. 2025-05-09
India Provision Of Earthing And Bonding To Safety Fencing Along The Track In Bhusawal-badnera & Bhusawal-khandwa Section Of Division Of Central Railway. 2025-05-09
India Electrical Work For Construction Of Rub/subway For Elimination Of Manned Level Crossing 6 Nos Am-13, Am-18, Am-22, Am-42, Mr-33 & Mr-45 Between Ada-gmo & Ksk-rjb Section In Division. 2025-05-09
India Part Supply Of Signaling Material, Installation, Testing & Commissioning In Connection With Reliability Improvement And Replacement Of Defective/overaged Midlife Signalling Gears 2025-05-09
Whats app