Filter Search


Energy,-Power-and-Electrical


Location Summary Deadline
-Installation-Of-Solar-Light-Infront-Of-Sukumar-Das-House-Code-Apas/01/003/140/0004-Instinstallation-Of-Solar-Light-Infront-Of-Pradip-Das-House-Near-Rail-Bridge-Within-Dhangdhinguri-Gp,-Cooch-Behar-Ii-Ps>India -Installation-Of-Solar-Light-Infront-Of-Sukumar-Das-House-Code-Apas/01/003/140/0004-Instinstallation-Of-Solar-Light-Infront-Of-Pradip-Das-House-Near-Rail-Bridge-Within-Dhangdhinguri-Gp,-Cooch-Behar-Ii-Ps>Nit 164/apas Sl 02installation Of Solar Light
Installation Of Solar Light Infront Of Sukumar Das House Code Apas/01/003/140/0004 Instinstallation Of Solar Light Infront Of Pradip Das House Near Rail Bridge Within Dhangdhinguri Gp, Cooch Behar Ii Ps
-Installation-Of-Solar-Light-Infront-Of-Sukumar-Das-House-Code-Apas/01/003/140/0004-Instinstallation-Of-Solar-Light-Infront-Of-Pradip-Das-House-Near-Rail-Bridge-Within-Dhangdhinguri-Gp,-Cooch-Behar-Ii-Ps>2026-01-01
-Supply-Fitting-And-Fixing-Of-Pole-With-Light-At-Various-Places-At-Ward-No-23-26-32-33-Under-Baranar-Municipality>India -Supply-Fitting-And-Fixing-Of-Pole-With-Light-At-Various-Places-At-Ward-No-23-26-32-33-Under-Baranar-Municipality>Wbmad /bm /apas(e) /nit-033/2025-26/sl-7
Supply Fitting And Fixing Of Pole With Light At Various Places At Ward No 23 26 32 33 Under Baranar Municipality
-Supply-Fitting-And-Fixing-Of-Pole-With-Light-At-Various-Places-At-Ward-No-23-26-32-33-Under-Baranar-Municipality>2026-01-01
-Supply-Fitting-And-Fixing-Of-Water-Cooler-Machine-With-Electrification-Works-At-Various-Places-At-Ward-No-7-11-12-13-16-30-Under-Baranar-Municipality>India -Supply-Fitting-And-Fixing-Of-Water-Cooler-Machine-With-Electrification-Works-At-Various-Places-At-Ward-No-7-11-12-13-16-30-Under-Baranar-Municipality>Wbmad /bm /apas(e) /nit-033/2025-26/sl-8
Supply Fitting And Fixing Of Water Cooler Machine With Electrification Works At Various Places At Ward No 7 11 12 13 16 30 Under Baranar Municipality
-Supply-Fitting-And-Fixing-Of-Water-Cooler-Machine-With-Electrification-Works-At-Various-Places-At-Ward-No-7-11-12-13-16-30-Under-Baranar-Municipality>2026-01-01
India Installation Of Solar Light 7 Nos In The Part Of 16/176 Under Churabhandar Gram Panchayat Within Jurisdiction Of Maynaguri Development Block 2026-01-01
India Isolating Switch Completed For Starting Battery .#* Provision Of Isolating Switch Complet For Starting Battery In Power Car As Per rdso Modification Sheet No. Rdso/pe/ms/ac/0086-2022 (rev.0) [ Warranty Period: 30 Months After The D ate Of Delivery ] ] 2026-01-01
India Installation Of Solar Submersible Pump With Overhead Tank At Jindharpur Paschimpara Apas/01/291/241/0003 2026-01-01
India Hard Drawn Round Copper Wire 7 Mm. Dia [ [hard Drawn Round Copper Wire 7 Mm. Dia [large dropper Wire] As Per Is:282-1982 Or Latest.] .#* Hard Drawn Round Copper Wire 7 Mm. Dia [large Dropper Wire] As Per Is:282-1982 Or Latest. [ Warranty P eriod: 30 Month 2026-01-01
India Installation Of High Mast Light At Nabagram Shibmandir Apas/01/291/240/0006 2026-01-01
India Installation Of High Mast Light Near Suresh Mistri House Apas/01/291/239/0004 2026-01-01
India 14. Supply, Delivery, Erection And Commisioning Of 1 No. 9 Mtr. High Hot Dip Mini Mast Tower 6 X 120 Watt Ied Flood Light For Rishra Municipality ,ward No. 13, Booth No. 219 (under Apas Scheme, Id. No. Apas/01/186/219/0002) 2026-01-01
Whats app