Filter Search


Energy,-Power-and-Electrical


Location Summary Deadline
India Installation Of 1 No Solar Light At Karamkal Ghosh Para Jl 86 Plot 484 Apas Id- Apas/01/285/250/0008 2025-12-30
India Installation Of 1 No Solar Light At Dcurlovpur Shib Mandir Jl 80 Plot 1142 Apas Id- Apas/01/285/252/0008 2025-12-30
India Installation Of 1 No Solar Light At Durlovpur Das Para Jl 80 Plot 1124 Apas Id- Apas/01/285/252/0010 2025-12-30
India Installation Of 1 No Solar Light At Durlovpur Imam Saheb Astana Jl 80 Plot 1106 Apas Id- Apas/01/285/252/0009 2025-12-30
India Installation Of 1 No Solar Light At Jamthalia Farid Para Jl-74, Plot-1130 Apas Id- Apas/01/285/243/0008 2025-12-30
-Installation-Of-2-Nos.-Solar-Light-Near-Amarpur-Depara-Kalimandir-And-Narayan-Temple>India -Installation-Of-2-Nos.-Solar-Light-Near-Amarpur-Depara-Kalimandir-And-Narayan-Temple>18/apas/booth-15(3rd Call)
Installation Of 2 Nos. Solar Light Near Amarpur Depara Kalimandir And Narayan Temple
-Installation-Of-2-Nos.-Solar-Light-Near-Amarpur-Depara-Kalimandir-And-Narayan-Temple>2025-12-30
India E-auction Sale Notice For Sale Of Immovable Assets Under The Securitisation And Reconstruction Of Financial Assets And Enforcement Of Security Interest Act, 2002. The Properties Being Sold Include Various Immovable Assets Mortgaged To The Bank, With Detai 2025-12-30
-Installation-Of-3-Nos.-Solar-Light-At-Amarpur-Hattala>India -Installation-Of-3-Nos.-Solar-Light-At-Amarpur-Hattala>18/apas/booth-15(3rd Call)
Installation Of 3 Nos. Solar Light At Amarpur Hattala
-Installation-Of-3-Nos.-Solar-Light-At-Amarpur-Hattala>2025-12-30
India Comprehensive Annual Electrical Maintenance Of Motors, Pumps And Electrical Panels At Stp, Ietp And Sewage Well Plant Of Blw/varanasi For A Period Of Two Years. Lt Aerial Bunched Cables Of Sizes 3cx70, 3cx95 & 3cx120 Sq Mm, Higher Capacity 4c Lt Cables (p 2025-12-30
-Construction-Of-1-No.-Cultural-Stage-At-24-Prahartala>India -Construction-Of-1-No.-Cultural-Stage-At-24-Prahartala>21/apas/booth-18(3rd Call)
Construction Of 1 No. Cultural Stage At 24 Prahartala
-Construction-Of-1-No.-Cultural-Stage-At-24-Prahartala>2025-12-30
Whats app