Filter Search


Energy,-Power-and-Electrical


Location Summary Deadline
Poland Supply Of Electricity In 2026-2027 (2 Parts) For The Needs Of The Podkarpackie Voivodship Institutions Complex In Rzeszów 2025-12-29
Poland The Subject Of The Order Is The Integrated Purchase Of Electricity For The Units Of Pgl Lp, Divided Into 2 Parts: 1) Part No. 1 - Delivery Along With The Repurchase (if Applicable) Of Electricity To All Ppe Included In The Procedure, Excluding Ppe With Th 2025-12-29
Germany 25b30533 - Jade University Location Oldenburg; New Building Workshop Building, Photovoltaic System Jhs Workshop Building 2025-12-29
Germany Bbs I Osterode, Renovation Of Digital Infrastructure - Electrical Work 2025-12-29
Thailand Procurement Plan: Expand The District, New Electricity Users Ban Nong Na Charoen, Village No. 6, Nong Phai Subdistrict, Mueang District, Udon Thani Province c-68-d-ud2sr.0166.01.1 Expand The District, New Electricity Users Ban Nong Na Charoen, Village No. 2025-12-29
Germany Installation Of Emergency Power System At Orpingstrasse Fire Station 2025-12-29
Germany 25b30533 - Jade University Oldenburg Location; New Workshop Building, Photovoltaic System Jhs Workshop Building 2025-12-29
India Set Of Rubber Items For Mounting Of Equipment .#* Set Of Rubber Items For Mounting Of Equipment To Panel Without E- 3 Brake Valve Consisti ng Of 38 Items 94 Nos. As Per Annexure - A (1) 3/8? Cut Off Cock W/o Vent For Rgeb O-ring I/d-14, C/s-2. 5 30070224, 2025-12-29
India 24 Fiber Armoured Optic Fibre Cable .#* 24 Fiber Armoured Optic Fibre Cable As Per Rdso Spec.irs:tc:55/2006 (rev-1) With A mendment No.3 Or Latest . [ Warranty Period: 12 Months After The Date Of Delivery ] [quantity Tolerance (+/-): 2 %age , Item Categor 2025-12-29
India Acrylic Moulded Reflector Fluorescent .#* Acrylic Moulded Reflector Fluorescent ( Colour Red ) To Size 80 Mm Dia To Drg. No. Skt-2012/ 2/c.matl.&spec. As Per Drg. [quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variation Permit 2025-12-29
Whats app