Filter Search


Energy,-Power-and-Electrical


Location Summary Deadline
-Supply-Of-Fixed-Contact-And-Moving-Contact-(200-Amps)-For-11kv-Ab-Switch>India -Supply-Of-Fixed-Contact-And-Moving-Contact-(200-Amps)-For-11kv-Ab-Switch>Enq.no.32-ii/25-26, Supply Of Fixed Contact And Moving Contact (200 Amps) For 11kv Ab Switch
Supply Of Fixed Contact And Moving Contact (200 Amps) For 11kv Ab Switch
-Supply-Of-Fixed-Contact-And-Moving-Contact-(200-Amps)-For-11kv-Ab-Switch>2025-12-30
India Replacement Of 1x10mva 110/11kv Power Transformers By 1x20mva, 110/11kv Power Transformers And Providing Additional Switchgear At 110/11kv Venkatagiri Sub Station In Gangavathi Taluk, Koppal District On Partial Turnkey Basis, Including Supply Of All Mater 2025-12-30
India Construction Of Boundary Wall, Internal Road And Drain Channel At Govt. Polytechnic Khatima, District-udham Singh Nagar. Construction Of C.g.m. Farm Office At Pantnagar University, District-udham Singh Nagar. Construction Of Girls Hostel Of Eklavaya Aawas 2025-12-30
-Supply-Of-11kv-Ab-Switches-200-Amps-With-11kv-Pt-Insulators>India -Supply-Of-11kv-Ab-Switches-200-Amps-With-11kv-Pt-Insulators>Enq.no.34-ii/25-26, Supply Of 11kv Ab Switches 200 Amps With 11kv Pt Insulators
Supply Of 11kv Ab Switches 200 Amps With 11kv Pt Insulators
-Supply-Of-11kv-Ab-Switches-200-Amps-With-11kv-Pt-Insulators>2025-12-30
India Construction Of Nandi Shala Near Govt. Iti Collage In Nagarpalika Hindoli 2025-12-30
India Addition Alteration To Flooring Of Garages At Ntrw G And Provision Of Two Ton Air Conditioner With Associated Electrical Fittings At Hq Gna Under Age Br I In Ge Gomantak Vasco 2025-12-30
India Construction Of District Police Chief Office At Malappuram-phase Iii(dsr 2021)(re) 2025-12-30
India Mopf 2024-25-construction Of New Building For Wandoor Police Statiion, Malappuram (dsr 2021) 2025-12-30
India Construction Of A Modernised Additional Godown Of 1700 Mt Capacity In Mayiladuthurai Warehouse Complex At Mayiladuthurai District 2025-12-30
India Digging And Laying Of 7.7 Km 48 Core Unarmoured Ofc With Accessories (1 Kilometer) Digging And Laying Of 7.7 Km 48 Core Unarmoured Ofc With Accessories 2025-12-30
Whats app