Filter Search


Energy,-Power-and-Electrical


Location Summary Deadline
Ukraine Electric Energy, Without Distribution 2025-12-30
Ukraine Ecoflow Delta 2 Charging Station (1024 Wh) 2025-12-30
Ukraine Backup Power System 2025-12-30
India Design, Supply, Execution, Installation, Testing & Commissioning Of Ei Based automatic Signalling System In The Section Anuppur-new Katni Junction((166 route Km, 18 Stations, 17 Block Sections) With Modification In Existing Working station Electronic Inte 2025-12-30
India Supply, Erection, Testing And Commissioning Of 2nd Circuit Stringing On 132kv Dc/sc Line From 220kv Ss Kalikiri To 132kv Ss Rompicherla For A Length Of 30.7km Oh Transmission Line, And Erection Of 1no. 132kv Feeder Bay At 220kv Ss Kalikiri And Erection Of 2025-12-30
India Replacement Of Old Transformer And Allied Switchgear Panel With New transformer And Allied Switchgear. .#* Replacement Of 02 Nos. Old 1600kva, 11kv/433v Transformers & Allied Switchgear Panel Wit h New Energy Efficient 2500kva, 11kv/433v, Level-3 Energy E 2025-12-30
India Widening & Pproviding B.t. Hot Mix Road With Central Divider Lighting At Ballemvari Street Road From Bandar Road To H.t. Line Road Junction From Apcrda Funds. 2025-12-30
India Estimate For Replacing Deteriorated/damaged/burnt Out Streetlights, U.g. Cable, Streetlight Control Boxes, High Mast Lights, L.t U.g. Loop Cable, Additional Streetlight Poles, Lt Meter Bank Panels Etc And Also Providing Cctv For All The Gates And Importan 2025-12-30
-Construction-Of-Rcc-Over-Head-Tank-1200kl--2nos.,-1500kl-And-1700kl,-Pump-House,-Mcs-Room,-Booster-Pump-Room,-Boundary-Wall,-Staff-Quarter,-Gate,-Site-Devel>India -Construction-Of-Rcc-Over-Head-Tank-1200kl--2nos.,-1500kl-And-1700kl,-Pump-House,-Mcs-Room,-Booster-Pump-Room,-Boundary-Wall,-Staff-Quarter,-Gate,-Site-Devel>Nagar Palika Parishad Maharajganj Reorganization Water Supply Scheme In District Maharajganj
Construction Of Rcc Over Head Tank 1200kl- 2nos., 1500kl And 1700kl, Pump House, Mcs Room, Booster Pump Room, Boundary Wall, Staff Quarter, Gate, Site Devel
-Construction-Of-Rcc-Over-Head-Tank-1200kl--2nos.,-1500kl-And-1700kl,-Pump-House,-Mcs-Room,-Booster-Pump-Room,-Boundary-Wall,-Staff-Quarter,-Gate,-Site-Devel>2025-12-30
India Construction Of New Government Homeo Dispensary Building Co-location Of Community Health Centre Gooty In Ananthapuramu District 2025-12-30
Whats app