Filter Search


Energy,-Power-and-Electrical


Location Summary Deadline
India Electrical Work For Provision Of Lhs At (i) Km 354/7-8 (ii)km 354/14-15 (up) And (iii) at Km 354/14-16 (dn) In Lieu Of Mb-1 And Mk-1 (up And Dn). 2025-07-14
India Comprehensive Annual Maintenance Contract Of Ips (m/s Hbl Make) In Spj Division Of E. C. Railway For three Years. 2025-07-14
India M.s Bracket For Light Unit Fixing At Coach Roof Etc .#* M.s Bracket For Light Unit Fixing At Coach Roof For Ac And Non Ac Coaches As Per Drg No Lw 44347 [ Warranty Period: 30 Months After The Date Of Delivery ] ] 2025-07-14
India Berth Reading Light Fitting With Usb Charging Socket Etc .#* Berth Reading Light Fitting With Usb Charging Socket For Upper Berth As Per Rcf Drawing No. lw76405 And Rdso Spec.no.rdso/pe/spec/tl/0091-2016 (rev.1) Or Latest [ Warranty Period: 30 Month s Aft 2025-07-14
India Procurement Of Vvvf Drive Test Bench. .#* Procurement Of Vvvf Drive Test Bench For Light Load Run Facilities For Traction Motors For 3 P hase Loco. As Per Annexure Attached. [ Warranty Period: 30 Months After The Date Of Delivery ] ] 2025-07-14
India Repairs/ Maint To Lt External Electrification (zone-iii) At Likabali Mil Stn Under Ge 872 Ews 2025-07-14
India Repair Maintenance Servicing Of Dg Sets, Lt Panels And Earthing At Likabali Mil Stn Under Ge 872 Ews. 2025-07-14
-For-The-Material-Used-In-15-V.c.-Room-Construction-Work>India -For-The-Material-Used-In-15-V.c.-Room-Construction-Work>New Vc Room Construction Work In Central Jail Rewa
For The Material Used In 15 V.c. Room Construction Work
-For-The-Material-Used-In-15-V.c.-Room-Construction-Work>2025-07-14
-For-Annual-Maintenance-Of-All-Parts-Of-The-Solar-Electric-Fencing-System-Installed-In-The-Central-Jail-Rewa-M.p.>India -For-Annual-Maintenance-Of-All-Parts-Of-The-Solar-Electric-Fencing-System-Installed-In-The-Central-Jail-Rewa-M.p.>Solar Electric Fencing System (amc) 2nd
For Annual Maintenance Of All Parts Of The Solar Electric Fencing System Installed In The Central Jail Rewa M.p.
-For-Annual-Maintenance-Of-All-Parts-Of-The-Solar-Electric-Fencing-System-Installed-In-The-Central-Jail-Rewa-M.p.>2025-07-14
India 1. Condenser Motor, 0.15kw, Supply 415v Ac 2. Blower Motor 0.12 Kw(blower Motor .#* Blower Motor 0.12 Kw(blower Motor With Extended Shaft),frame:63, Frequency 50 Hz+/ 5%, voltage 415+/-10%,rpm: 1350,connection: Star,3 Phase,ref:is325 For Roof Mounted Pack 2025-07-14
Whats app