Filter Search


Energy,-Power-and-Electrical


Location Summary Deadline
India Construction Of Cultural Hall At Salbagan Club (rms), Ward No.-18, Booth-111, Under D.m.c. Area. 2025-12-31
India Solar Sub Miscible At Sidara Mukta Mancha 2025-12-31
India Solar System Connection Of Submersible Nearest Dinabandhu Mahali Land 2025-12-31
India Installation Of 3 Nos Steel Tubular Poles And 6 Nos Street Lights (using 9 Mtr Steel Tubular Pole) At Sector 2c, Cultural Club Play Ground, Under Ward No -27 Of Durgapur Municipal Corporation. 2025-12-31
India Solar Submircible At Suabasa Cowmatha More 2025-12-31
India Solar Light At Different Place 7 No Apas/01/269/235/0004 At Purbasthali Under Purbasthali Gp 2025-12-31
-Installation-Of-1-No-Ldtw-(solar)-(depth-100m)-With-Pvc-Pipe-At-Mollasarul-(j.l.-No.--026)-Within-Burdwan-(a-i)-Sub--Division-In-Serorai-G.p.,galsi-i-Block,-Plot-No--6510-(la>India -Installation-Of-1-No-Ldtw-(solar)-(depth-100m)-With-Pvc-Pipe-At-Mollasarul-(j.l.-No.--026)-Within-Burdwan-(a-i)-Sub--Division-In-Serorai-G.p.,galsi-i-Block,-Plot-No--6510-(la>Installation Of 1 No Ldtw (solar) (depth 100m) With Pvc Pipe At Mollasarul
Installation Of 1 No Ldtw (solar) (depth 100m) With Pvc Pipe At Mollasarul (j.l. No.- 026) Within Burdwan (a-i) Sub- Division In Serorai G.p.,galsi-i Block, Plot No -6510 (la
-Installation-Of-1-No-Ldtw-(solar)-(depth-100m)-With-Pvc-Pipe-At-Mollasarul-(j.l.-No.--026)-Within-Burdwan-(a-i)-Sub--Division-In-Serorai-G.p.,galsi-i-Block,-Plot-No--6510-(la>2025-12-31
-Installation-Of-1-(one)-No-Of-Light-Duty-Tube-Well-(solar-Operated)-Of-Size-150-Mm-X-150-Mm-(pvc-Pipes,-Dept>India -Installation-Of-1-(one)-No-Of-Light-Duty-Tube-Well-(solar-Operated)-Of-Size-150-Mm-X-150-Mm-(pvc-Pipes,-Dept>Installation Of 1 (one) No Of Light Duty Tube Well (solar Operated) Of Size 150 Mm X 150 Mm (pvc Pipes, Depth 110 Metre) At Mouza - Junidpur
Installation Of 1 (one) No Of Light Duty Tube Well (solar Operated) Of Size 150 Mm X 150 Mm (pvc Pipes, Dept
-Installation-Of-1-(one)-No-Of-Light-Duty-Tube-Well-(solar-Operated)-Of-Size-150-Mm-X-150-Mm-(pvc-Pipes,-Dept>2025-12-31
India Installation Of Solar Light At Gitabhaban Chowpathy Debibari Samsan Changmari Masjid Jarabari Ssk Ganesh Barman Sarat Barman At Jarabari 1st Part 2025-12-31
India Installation Of 4(four) Nos. Solar Street Light At Adibasi Para (01), Mahanty Para More (01), Hatui Para Saraswati Mela Ground(01), Dangar Para More (01) At Andharia Mouza Under Ps-29 Of Goalbari G.p. Under Sarenga Block Out Of Apas 2025-26 2025-12-31
Whats app