Filter Search


Energy,-Power-and-Electrical


Location Summary Deadline
Germany Vmware Including Maintenance Extension 2025-08-05
India Supply Installation Testing And Commissioning Of Signalling Material In Connection with :- Additional Up Loop Line With Removal Of Psr At Limkheda Station. 2025-08-05
India Special Repairs To Conversion Of Lt Overhead Line To Ug Cable And Other Allied Works In Md Accn And Certain Other Unit Location At Narangi Military Station Under Ge Narangi 2025-08-05
India Tender Invited For Electron Beam Irradiated Copper Cable, Size: 10 Sq. Mm., Voltage Grade: 1.8/3.0 Kv, Colour: Grey Confirming To Rdso Specification No. Elrs/spec/elc/0019, Rev-4 Of Feb 2018. [ Warranty Period: 30 Months After The Date Of Delivery ][quant 2025-08-05
India Set Of Cage Clamp Terminals With Glass Fuses For Lhb Eog Ac-3 Tier coaches .#* Set Of Cage Clamp Terminals With Glass Fuses For Lhb Eog Ac-3 Tier Coaches . As Per Specn: Edml-230, Rev-nil, Table-1. Packing Instruction - Spi208 [ Warranty Period: 30 Mont h 2025-08-05
India High Voltage 20 Amps Fuse Cylindrical Type With Striker In Breaking Capacity 3.6kv/50ka To Eaton Bussman Make Model No. 3.6wdohs20. Acceptable makes: Siba, Eti, Efen, Ferraz, Siemens, Bussman. .#* High Voltage 20 Amps Fuse Cylindrical Type With Striker In 2025-08-05
India M.s. Conduit Pipe .#* M. S. Conduit Pipe Electric Resistance Welded Stove Enameled Painted With M edium Corrosion Protection With Medium Mechanical Stresses, For Electrical Wiring No minal Size Of Conduit 25 Mm In Running Length Of 3 Mtrs. With Coupling A 2025-08-05
India High Voltage Bushing .#* High Voltage Bushing, Clw Spec.no. Clw/es/3/0052.(alt.-e Or Latest) And Clws Dr g.no.- Clw/es/3/sk2/0052 (alt.-e Or Latest) & Clw/es/3/sk-3/0052 (alt.-e Or Latest). Term-latest Mea ns The Alterations Up To The Actual Date Of Closi 2025-08-05
Bosnia and Herzegovina Preparation For The Transition To 20 Kv Of The Mrkotic, From The Primary Ts 110 / X Jelah For The Needs Of The Branch "elektrodistribucija", Zenica 2025-08-05
Germany Duren Duren Demination Okostrom Delivery 20262027, Electricity 2025-08-05
Whats app