Filter Search


Energy,-Power-and-Electrical


Location Summary Deadline
India Repair Replacement Maint Of Internal Electrification Including Repairs Of Ceiling Fans Exhaust Fan Pedestal Fan Wall Fan Etc And Other Allied Works At Rci Technical Area Zone-i Under Ge I Rnd Rci Hyderabad 2025-07-14
India Repaire Maintenance Replacement Of Street Lights Garden Lights Building Security Lights And Highmast Lights With Allied Work At Rci Technical Area Zone -ii Eetf Elsec Cpdc And Etc Under Ge I Rnd Rci Hyderabad 2025-07-14
India Supply, Delivery And Installation Of 20 Kva, Servo Motor Operated Copper Wound Line Voltage Stabilizer Jogijhora Barabak Water Supply Scheme Tw No.-i Under Nmd-ii, Phe Dte, Alipurduar. 2025-07-14
-Repair-And-Renovation-Of-Opd-Building,toilet-Block,drinking-Water-Etc.-In-Dunigram-Phc-Under-Baswa-Bphc,-Rampurthat-Hd,-Birbhum.-(rn24002802,-Pid--Hf252635506s000).>India -Repair-And-Renovation-Of-Opd-Building,toilet-Block,drinking-Water-Etc.-In-Dunigram-Phc-Under-Baswa-Bphc,-Rampurthat-Hd,-Birbhum.-(rn24002802,-Pid--Hf252635506s000).>Wb/pwd/ss/ee/bir/03/2025-26
Repair And Renovation Of Opd Building,toilet Block,drinking Water Etc. In Dunigram Phc Under Baswa Bphc, Rampurthat Hd, Birbhum. (rn24002802, Pid- Hf252635506s000).
-Repair-And-Renovation-Of-Opd-Building,toilet-Block,drinking-Water-Etc.-In-Dunigram-Phc-Under-Baswa-Bphc,-Rampurthat-Hd,-Birbhum.-(rn24002802,-Pid--Hf252635506s000).>2025-07-14
-Provn-Of-Certain-Building-Work-And-Connected-Services-At-Shashidharunder-881-Ews>India -Provn-Of-Certain-Building-Work-And-Connected-Services-At-Shashidharunder-881-Ews>Ge/pnh-81/2024-25
Provn Of Certain Building Work And Connected Services At Shashidharunder 881 Ews
-Provn-Of-Certain-Building-Work-And-Connected-Services-At-Shashidharunder-881-Ews>2025-07-14
Japan J-parc Mr Main Electromagnet Power Supply Capacitor Bank Capacitor Units 36 Units 2025-07-14
India Construction Of Additional Class Room And Toilet Block At Amritanagar Primary School, Mouza-amtali Under Gosaba Development Block. 2025-07-14
-Construction-Of-New-Class-Room-At-Belda-Mirzapur-High-School-Under-Dantan-ii-Block.-Mouza-belda,-Jl-No.236,-Plot-239.>India -Construction-Of-New-Class-Room-At-Belda-Mirzapur-High-School-Under-Dantan-ii-Block.-Mouza-belda,-Jl-No.236,-Plot-239.>Pmid/dtn2/eo/nit06/sl03
Construction Of New Class Room At Belda Mirzapur High School Under Dantan-ii Block. Mouza-belda, Jl No.236, Plot-239.
-Construction-Of-New-Class-Room-At-Belda-Mirzapur-High-School-Under-Dantan-ii-Block.-Mouza-belda,-Jl-No.236,-Plot-239.>2025-07-14
United States Consultant Services To Support The Promotion And Scale Up Of Productive Uses Of Electricity (pue) 2025-07-14
Philippines Proposed Installation Of Three 3 Phase Primary Line Extension, Three 3 Units 100kva Distribution Transformers And Primary Metering For New Municipal And Legislative Building 2025-07-14
Whats app