Filter Search


Energy,-Power-and-Electrical


Location Summary Deadline
-Installation-Of-Lamp-Post-Along-With-High-Voltage-Led-Light-Booth-No---232-,-Apas-/-01-/-117/-232-/-0002-In-Ward-No---23-Under-South-Dum-Dum-Municipality>India -Installation-Of-Lamp-Post-Along-With-High-Voltage-Led-Light-Booth-No---232-,-Apas-/-01-/-117/-232-/-0002-In-Ward-No---23-Under-South-Dum-Dum-Municipality>Wbmad/ulb/sddm/nit688/11/25sl8
Installation Of Lamp Post Along With High Voltage Led Light Booth No - 232 , Apas / 01 / 117/ 232 / 0002 In Ward No - 23 Under South Dum Dum Municipality
-Installation-Of-Lamp-Post-Along-With-High-Voltage-Led-Light-Booth-No---232-,-Apas-/-01-/-117/-232-/-0002-In-Ward-No---23-Under-South-Dum-Dum-Municipality>2025-12-30
-Upgradation-Of-Road-With-Pcc-Near-Ramu-Karmakar-House-Towards-Main-Road-At-Bahulia-Under-Hgp-Under-Sonamukhi-Development-Block.-Scheme-Id-Apas/01/258/56/0003>India -Upgradation-Of-Road-With-Pcc-Near-Ramu-Karmakar-House-Towards-Main-Road-At-Bahulia-Under-Hgp-Under-Sonamukhi-Development-Block.-Scheme-Id-Apas/01/258/56/0003>38/hami/apas/2025-26(1st Call) Sl 02
Upgradation Of Road With Pcc Near Ramu Karmakar House Towards Main Road At Bahulia Under Hgp Under Sonamukhi Development Block. Scheme Id Apas/01/258/56/0003
-Upgradation-Of-Road-With-Pcc-Near-Ramu-Karmakar-House-Towards-Main-Road-At-Bahulia-Under-Hgp-Under-Sonamukhi-Development-Block.-Scheme-Id-Apas/01/258/56/0003>2025-12-30
India Installation Of High Mast Light In Front Of Barakulberia Chor Kali Mandir Beside Plassey To Kaliganj High Way . 2025-12-30
India Supply Of Mcbs For Providing Proper Lighting In And Around The Sub-stations For 400kv, Omc Circle Mcbs-32a, Mcbs-16a, Mcbs-63a, Mccbs-100a 2025-12-30
India Akankshi Nagar Yojanantargat Nagar Panchayat Payagpur Men Block Parisar Ke Andar Khali Bhoomi Par Adhyayan Kendra Ki Sthapna Hetu Library Ka Nirman Karya. 2025-12-30
India Condenser Fan Motor For Roof Mounted Air Conditioning System For Three Phase locomotives. Rating - 0.15/0.2 Kw/hp, Rpm 1360, Frame 63 And As Per Rdsos spec. No. Rdso/pe/spec/ac/0089 (rev. - 0) 2008 With Amendment 1 & 2. .#* Condenser Fan Motor For Roof Mo 2025-12-30
India Setting Up Of 125 Mw/500 Mwh Standalone Battery Energy Storage Systems In Chhattisgarh For On-demand Usage Under Tariff-based Competitive Bidding. Battery Energy Storage Systems 2025-12-30
India Wiper Assly. Consisting Of I) Wipper Motor Assly. (icf) For Emu To m/s.elgi Pt. No. 09021052b - 1 No. Ii) Wiper Control Valve Assly. (icf) To elgi Pt. No.090442770 - 1 No. Along With Latest Amendment/alteration If any. .#* Wiper Assly. Consisting Of I) Wi 2025-12-30
India Battery Packing Taper Piece As Per Els/bza Drg. No. B/trs/g7/bat/4/2 Or Latest If any.material : Teak Wood Or Neem Wood. Note: One Sample Should Be Got Approved before Effecting Bulk Supply. .#* Battery Packing Taper Piece As Per Els/bza Drg. No. B/trs/g7 2025-12-30
India Piggy Back 2.5 Sq.mm Insulated Cable Lug. .#* Piggy Back 2.5 Sq.mm Insulated Cable Lug. [ Warranty Period: 30 Months After The Date Of delivery ] [quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variation Permitted: max 8 Lacs ] 2025-12-30
Whats app