Filter Search


Energy,-Power-and-Electrical


Location Summary Deadline
-New-Drain-Construction-From-H/o-Anu-Lama-To-H/o-Prasenjit-Barman-Under-Mal-Muniucipality,-Ward---2,-Ac-20-(mal),-Booth-116,-Project(s)-Id.-No-apas/01/020/116/0003,-Source-Of-Fund-Apas-Fund>India -New-Drain-Construction-From-H/o-Anu-Lama-To-H/o-Prasenjit-Barman-Under-Mal-Muniucipality,-Ward---2,-Ac-20-(mal),-Booth-116,-Project(s)-Id.-No-apas/01/020/116/0003,-Source-Of-Fund-Apas-Fund>Mm/c/apas/06/2025-26 Sl 02
New Drain Construction From H/o Anu Lama To H/o Prasenjit Barman Under Mal Muniucipality, Ward - 2, Ac-20 (mal), Booth 116, Project(s) Id. No-apas/01/020/116/0003, Source Of Fund Apas Fund
-New-Drain-Construction-From-H/o-Anu-Lama-To-H/o-Prasenjit-Barman-Under-Mal-Muniucipality,-Ward---2,-Ac-20-(mal),-Booth-116,-Project(s)-Id.-No-apas/01/020/116/0003,-Source-Of-Fund-Apas-Fund>2025-12-30
-Construction-Of-Tin-Shed-At-Nazrul-Pally-Booth-No.224,scheme-Id-apas/01/190/224/0015,-Construction-Of-Community-Hall-At-The-Area>India -Construction-Of-Tin-Shed-At-Nazrul-Pally-Booth-No.224,scheme-Id-apas/01/190/224/0015,-Construction-Of-Community-Hall-At-The-Area>Wbmad/c/hcm/eng/ Apas/ Nit19/11e/25/1,tin Shed, Community Hall In Ward No7 Under Apas, Hooghly- Chinsurah Municipality.
Construction Of Tin Shed At Nazrul Pally Booth No.224,scheme Id-apas/01/190/224/0015, Construction Of Community Hall At The Area
-Construction-Of-Tin-Shed-At-Nazrul-Pally-Booth-No.224,scheme-Id-apas/01/190/224/0015,-Construction-Of-Community-Hall-At-The-Area>2025-12-30
India Construction Of Mid-day Mill Shed At Kalyanpur F.p. School 2025-12-30
-Construction-Of-Drain,-Clas>India -Construction-Of-Drain,-Clas>Wbmad/c/hcm/eng/ Apas/ Nit19/11e/25/3,construction Of Drain, Classroom, Supply And Installation Of 6meter Gi Pipe Polewith 20 W Ledstreet Light, Renovation Of Concrete Road Ward No 01 Under Hooghly-chinsurah Municipality.
Construction Of Drain, Clas
-Construction-Of-Drain,-Clas>2025-12-30
-Repair>India -Repair>Wbmad/c/hcm/eng/ Apas/ Nit19/11e/25/4,repairing Ofwork Of Bituminous Road,maintenance Of Roof And Paintingof Building Grilland Repearing Oftoilet And Roof Andrequisition Ofbenches, Road And Drain,construction Ofboundary Wall Andshadeofc.halll
Repair
-Repair>2025-12-30
India Installation Of Solar Based Drinking Water Project 2025-12-30
-Euc>India -Euc>Wbmad/c/hcm/eng/ Apas/ Nit19/11e/25/6,eucalyptus Ballah Piling,construction,renovation Ofsurface High Drain, Construction Ofconcrete Road, Construction Ofsurface Drain,supply, Installation Of6metergipipe Pole With 20w Leds.light,wno.-01underapas
Euc
-Euc>2025-12-30
India Installation Of Led Solar Street Light 2025-12-30
>India >Wbmad/c/hcm/eng/ Apas/ Nit19/11e/25/7, Renovation Of Concrete Road, Supply,insrenovation Ofconcrete Road,supply, Installation Of 6meter Gi Pipe Polewith 20w Ledstreet Light, Excavation Ofpond, In Ward No.-07under Apas, Hooghly-chinsurahmunicipality
>2025-12-30
India Installation Of Solar Based Drinking Water Project 2025-12-30
Whats app