Filter Search


Energy,-Power-and-Electrical


Location Summary Deadline
India Construction Of Class Room On Gsss Kushalpura (4 Nos) Gsss Bhim (8 Nos) Pkg No. Dmft/gc-16/09 2025-07-31
India Construction Of Class Room On Gsss Piplinagar (5 Nos) Mgemgs Mediya (4 Nos) Pkg No. Dmft/gc-16/10 2025-07-31
India Construction Of Class Room On Gsss Barla Choura (4 Nos) Gsss Kukra (4 Nos) Pkg No. Dmft/gc-16/11 2025-07-31
India Construction Of Class Room On Gsss Kaladeh (4 Nos) Gps Samburiya (5 Nos) Mgemgs Bunglow Ka Badiya (4 Nos) Pkg No. Dmft/gc-16/12 2025-07-31
India Construction Of Class Room On Gsss Lakhagura (5 Nos) Gsss Baggar (4 Nos) Pkg No. Dmft/gc-16/13 2025-07-31
India Ward No. 30 Me Sthit Vibhinn Parko Me Nirman Karya Evm Ward Me Anya Vikas Karya (punh Nivida) 2025-07-31
-Electro-Mechanical-Works>India -Electro-Mechanical-Works>Operation And Guarding Of The Pumping Machinery At Badinan Water Supply Scheme Block Polba Dadpur District Hooghly Under Electrical Division Phe Dte
Electro Mechanical Works
-Electro-Mechanical-Works>2025-07-31
India Cable Terminal & Cable Socket .#* Cable Socket To Suit 2.5 Sq Mm Cable 5.2 Mm Dia Hole Type-18 B As Per Clw Specific ation No. Clw/es/s-25/i And Drg. No. Clw/es/sk-5/s-25/i. Note: 1) This Item Is Reserved For Clw Ap proved Sources Only As Per Vendors Dire 2025-07-31
India Breather Assy. For Transformer Type Lot 6500/7500 As Per Abb Document No- hstn 422029p001. .#* Breather Assy. For Transformer Type Lot 6500/7500 As Per Abb Document No-hstn 422 029p001. [ Warranty Period: 30 Months After The Date Of Delivery ] ] 2025-07-31
-Electro-Mechanical-Works>India -Electro-Mechanical-Works>Operation And Guarding Of The Pumping Machinery At Sabalsinghapur Water Supply Scheme Block Khanakul Ii District Hooghly Under Electrical Division Phe Dte
Electro Mechanical Works
-Electro-Mechanical-Works>2025-07-31
Whats app