Filter Search


Energy,-Power-and-Electrical


Location Summary Deadline
Japan Electricity Supply To The National Maritime Research Institute, 1set 2025-12-22
Japan Electricity To Be Used In Riken Center For Computational Science For Fy2026, Contract Demand 27,000kw Maximum, The Estimated Consumption Electric Power A Year 157,680,000kwh 2025-12-22
Japan Electricity To Be Used In Tokyo Plant, National Printing Bureau, Incorporated Administrative Agency Contract 7,400kw, The Estimated Electricity About 15,663,000kwh 2025-12-22
Japan Purchase Of High Voltage Panels And Power Center Circuit Breakers For Normal Power Supply Of Httr, 1 Set 2025-12-22
Japan Electricity To Be Used In Ouji Plant, National Printing Bureau, Incorporated Administrative Agency Contract 2,300kw (from 1 April 2026 Through 31 October 2026), 3,400kw (from 1 November 2026 Through 31 March 2027), The Estimated Electricity About ... 2025-12-22
France Renovation Of The Lighting System For Large Playgrounds 2025-12-22
Japan Electric Power To Be Consumed At The Second Fukuoka Legal Affairs Synthesis Government Building And Other Offices. Estimated Annual Consumption Of 4,859,100kwh 2025-12-22
Japan Supply And Demand Contract For Electricity Used In Fukuoka Second Legal Affairs General Government Building And 15 Other Government Buildings 2025-12-22
Japan Electricity Used At 7 Locations Outside The Ono Electric Office Of The Nobeoka River And National Highway Office (projects Covered By The Electronic Procurement System) 2025-12-22
Japan Electricity Used At Two Locations Outside The Nobeoka River And National Highway Office Uwada Electric Office (projects Covered By The E-procurement System) 2025-12-22
Whats app