Filter Search


Energy,-Power-and-Electrical


Location Summary Deadline
Iran Islamic Republic of Repair Gas Transferring Equipment Include Feed Lines And Distribution, Protection From Rust, Relocation , Gathering Split, Installation , Replace And Gathering Meter And Regulator And Construction And Installation Split At Town Boaein And Miyandasht And A 2025-07-26
India Street Light Illumination System Under Green City Project At Ramnagar-1 Under Baruipur Purba Assembly Constituency. (364) 2025-07-26
India Street Light Illumination System Under Green City Project At South Garia Under Baruipur Purba Assembly Constituency. (365). 2025-07-26
India Construction Of Dr. Bhim Rao Ambedkar, Sc/st (10+2) Residential High School (720 Bedded) Capacity At Bahadurpur, Darbhanga (including Fire Fighting + Furniture +electrical Works+5 Year Maintenance Work) 2025-07-26
India Construction Of Community Building Cum Workshed. 2025-07-26
>India >Comprehensive Maintenance And Petty Repair Of Internal Water Supply Including Repair Of Geyser Cleaning Of Service Tanks And Some Connected Works In F G H And J Area At Naval Base And Checking Repair And Replacement Of Earthing And Lightening Arres
>2025-07-26
India Repair/maint To Lightning Arresters, Earthenings And Associated Wks At Patiala Mil Stn Under Ge(n) Patiala 2025-07-26
Iran Islamic Republic of Repair Gas Transferring Equipment Include Feed Lines And Distribution, Protection From Rust, Relocation , Gathering Split, Installation , Replace And Gathering Meter And Regulator And Construction And Installation Split At Town Feridonshahr And Areas 2025-07-26
Iran Islamic Republic of Construction Foundation And Purchase And Installation Tower And Wiring Lines 2 And 4 Exit Circuit 63 Kv And Entrance Line 230 Kv Post 230 Borojerd 2025-07-26
-Construction-Of-Srm-University-Jhargram-In-The-District-Of-Jhargram-(2nd-Phase)---supply,-Installation,-Testing-,-Commissioning-Of-Passenger-Lift-At-Academic-Buildings--I,-Ii-,-Iii.>India -Construction-Of-Srm-University-Jhargram-In-The-District-Of-Jhargram-(2nd-Phase)---supply,-Installation,-Testing-,-Commissioning-Of-Passenger-Lift-At-Academic-Buildings--I,-Ii-,-Iii.>Wbpwd/sse/swec/niq01/2025-26
Construction Of Srm University Jhargram In The District Of Jhargram (2nd Phase)---supply, Installation, Testing , Commissioning Of Passenger Lift At Academic Buildings- I, Ii , Iii.
-Construction-Of-Srm-University-Jhargram-In-The-District-Of-Jhargram-(2nd-Phase)---supply,-Installation,-Testing-,-Commissioning-Of-Passenger-Lift-At-Academic-Buildings--I,-Ii-,-Iii.>2025-07-26
Whats app