Filter Search


Energy,-Power-and-Electrical


Location Summary Deadline
India Street Light Illumination System Under Green City Project At South Garia Under Baruipur Purba Assembly Constituency. (365). 2025-07-26
India Construction Of Dr. Bhim Rao Ambedkar, Sc/st (10+2) Residential High School (720 Bedded) Capacity At Bahadurpur, Darbhanga (including Fire Fighting + Furniture +electrical Works+5 Year Maintenance Work) 2025-07-26
India Construction Of Community Building Cum Workshed. 2025-07-26
>India >Comprehensive Maintenance And Petty Repair Of Internal Water Supply Including Repair Of Geyser Cleaning Of Service Tanks And Some Connected Works In F G H And J Area At Naval Base And Checking Repair And Replacement Of Earthing And Lightening Arres
>2025-07-26
India Repair/maint To Lightning Arresters, Earthenings And Associated Wks At Patiala Mil Stn Under Ge(n) Patiala 2025-07-26
Iran Islamic Republic of Repair Gas Transferring Equipment Include Feed Lines And Distribution, Protection From Rust, Relocation , Gathering Split, Installation , Replace And Gathering Meter And Regulator And Construction And Installation Split At Town Feridonshahr And Areas 2025-07-26
Iran Islamic Republic of Construction Foundation And Purchase And Installation Tower And Wiring Lines 2 And 4 Exit Circuit 63 Kv And Entrance Line 230 Kv Post 230 Borojerd 2025-07-26
-Construction-Of-Srm-University-Jhargram-In-The-District-Of-Jhargram-(2nd-Phase)---supply,-Installation,-Testing-,-Commissioning-Of-Passenger-Lift-At-Academic-Buildings--I,-Ii-,-Iii.>India -Construction-Of-Srm-University-Jhargram-In-The-District-Of-Jhargram-(2nd-Phase)---supply,-Installation,-Testing-,-Commissioning-Of-Passenger-Lift-At-Academic-Buildings--I,-Ii-,-Iii.>Wbpwd/sse/swec/niq01/2025-26
Construction Of Srm University Jhargram In The District Of Jhargram (2nd Phase)---supply, Installation, Testing , Commissioning Of Passenger Lift At Academic Buildings- I, Ii , Iii.
-Construction-Of-Srm-University-Jhargram-In-The-District-Of-Jhargram-(2nd-Phase)---supply,-Installation,-Testing-,-Commissioning-Of-Passenger-Lift-At-Academic-Buildings--I,-Ii-,-Iii.>2025-07-26
-For-Rewinding-Of-Operating-Motor-Of-High-Mast-And-Replacement-Of-Defective-400w-Hpsv-Lamp-Fitting-By-250w-Led-Flood-Light-And-Other-Related-Works-At-220kv-Ss-Radhanagar-Fatehpur>India -For-Rewinding-Of-Operating-Motor-Of-High-Mast-And-Replacement-Of-Defective-400w-Hpsv-Lamp-Fitting-By-250w-Led-Flood-Light-And-Other-Related-Works-At-220kv-Ss-Radhanagar-Fatehpur>Et 04 Etdf 2025 26
For Rewinding Of Operating Motor Of High Mast And Replacement Of Defective 400w Hpsv Lamp Fitting By 250w Led Flood Light And Other Related Works At 220kv Ss Radhanagar Fatehpur
-For-Rewinding-Of-Operating-Motor-Of-High-Mast-And-Replacement-Of-Defective-400w-Hpsv-Lamp-Fitting-By-250w-Led-Flood-Light-And-Other-Related-Works-At-220kv-Ss-Radhanagar-Fatehpur>2025-07-26
India Repair / Maint Including Replacment Of Damaged Service Connections, Repair / Maint Of Various Outdoor E/m Assets Including Fencing, Filling Of Gravels And Connected Items In Tech Area And Repair/maint Of High Mast Lights Along With Other Accessories 2025-07-26
Whats app