Filter Search


Energy,-Power-and-Electrical


Location Summary Deadline
India 33 Kv Horn Gap Fuse Sets With 2x24 Kv Post Insulators (un-assembled) 2025-07-25
India Procurement Of Fives Combustion Systems Pvt. Ltd. Make Hei Igniters Assembly Spares Installed At 2x600mw, Sstpp, Mppgcl, Dongalia 2025-07-25
India Etender For Supply Installation Main Lt Panel From Main Sub Station To Ramp Panel At Ggsmch Fdk 2025-07-25
-Supply-Of-Various-Type-Of-Electrical-Material/components>India -Supply-Of-Various-Type-Of-Electrical-Material/components>Supply Of Electrical Material/components
Supply Of Various Type Of Electrical Material/components
-Supply-Of-Various-Type-Of-Electrical-Material/components>2025-07-25
India Providing, Supplying Of Led 70 Watt Ward Samiti 05 Ward 21, 20 File No 37/25/6/4 2025-07-25
-Indore-Municipal-Corporation-Intends-To-Invite-The-Tender-For-Supply,-Installation,-Testing-And-Commissioning-Of-New-Pole-And-Lighting-Work-At-Differ>India -Indore-Municipal-Corporation-Intends-To-Invite-The-Tender-For-Supply,-Installation,-Testing-And-Commissioning-Of-New-Pole-And-Lighting-Work-At-Differ>Supply, Installation, Testing And Commissioning Of New Pole And Lighting Work At Different Location
Indore Municipal Corporation Intends To Invite The Tender For Supply, Installation, Testing And Commissioning Of New Pole And Lighting Work At Differ
-Indore-Municipal-Corporation-Intends-To-Invite-The-Tender-For-Supply,-Installation,-Testing-And-Commissioning-Of-New-Pole-And-Lighting-Work-At-Differ>2025-07-25
-Construction-Of-Initial-Infra>India -Construction-Of-Initial-Infra>Construction Of Initial Infrastructure At Bop 1000 Golai Of 61 Bn Ssb Balemu Under Frontier Hqrs Ssb Tezpur 1 Spt Bop Cdr Ocr 2 Spt Jawan Bk 3kitchen Cum Dining Hall 4 Spt Quarter Guard 5 Permanent Toilet And Bath Block
Construction Of Initial Infra
-Construction-Of-Initial-Infra>2025-07-25
India Construction Of High School Building At Gyanpura Dist Dhar M.p. 2025-07-25
-Strengthing-Work-Of-Harat-Badagaon-Bartlai-Deori-Doli-Chikardha-Road-Length-14.20-Km.-Under-Hatta-Sub-Division-With-Electrification>India -Strengthing-Work-Of-Harat-Badagaon-Bartlai-Deori-Doli-Chikardha-Road-Length-14.20-Km.-Under-Hatta-Sub-Division-With-Electrification>13/2025-26 Dt.10.07.2025
Strengthing Work Of Harat Badagaon Bartlai Deori Doli Chikardha Road Length 14.20 Km. Under Hatta Sub Division With Electrification
-Strengthing-Work-Of-Harat-Badagaon-Bartlai-Deori-Doli-Chikardha-Road-Length-14.20-Km.-Under-Hatta-Sub-Division-With-Electrification>2025-07-25
-Dismantling-Of-Existing-Damaged-Rcc-Structures-And-Provision-Of-2-Nos-Of-230-Kv-Ab-Switch-(woe)-Plinth-For-Providing-New-Steel-Structures-In-230-Kv-Ponnapuram-iii-Feeder-Of-Bus-i-And-Bus-ii-Isolators-At-230-Kv-Myvadi-S>India -Dismantling-Of-Existing-Damaged-Rcc-Structures-And-Provision-Of-2-Nos-Of-230-Kv-Ab-Switch-(woe)-Plinth-For-Providing-New-Steel-Structures-In-230-Kv-Ponnapuram-iii-Feeder-Of-Bus-i-And-Bus-ii-Isolators-At-230-Kv-Myvadi-S>Ee/o/myi/lt08/25-26dt.10.07.25
Dismantling Of Existing Damaged Rcc Structures And Provision Of 2 Nos Of 230 Kv Ab Switch (woe) Plinth For Providing New Steel Structures In 230 Kv Ponnapuram-iii Feeder Of Bus-i And Bus-ii Isolators At 230 Kv Myvadi S
-Dismantling-Of-Existing-Damaged-Rcc-Structures-And-Provision-Of-2-Nos-Of-230-Kv-Ab-Switch-(woe)-Plinth-For-Providing-New-Steel-Structures-In-230-Kv-Ponnapuram-iii-Feeder-Of-Bus-i-And-Bus-ii-Isolators-At-230-Kv-Myvadi-S>2025-07-25
Whats app