Filter Search


Energy,-Power-and-Electrical


Location Summary Deadline
India Installation Of Solar Submersible Pump Near Paschim Para Annapurna Tala At Shitalgram Under Kaichar I Gp_id_apas/01/272/176/0010 2025-12-29
-Electrification-Work-Atharijan-Pally-97-No-Icdscenter(apas/01/260/203/0011)>India -Electrification-Work-Atharijan-Pally-97-No-Icdscenter(apas/01/260/203/0011)>Wbmad/bm/apas/19/203/25-26/1
Electrification Work Atharijan Pally 97 No Icdscenter(apas/01/260/203/0011)
-Electrification-Work-Atharijan-Pally-97-No-Icdscenter(apas/01/260/203/0011)>2025-12-29
India Construction Of Community Hall At Kalosona Jl 79 Plot 343 Under Apas Id- Apas/01/285/241/0005 2025-12-29
India Construction Of Mukhagnitala And Solar Light Inst, , Jl-71, Plot-1321 Under Parulia Gp Apas Id- Apas/01/285/246/0002 2025-12-29
India Replacement Of Existing Banging Type Mechanism Boxes With Motor Operated Mechanism Boxes To All 18nos 132kv Isolators Available At 132/33kv Substation ,guntur 2025-12-29
India Repairment Of Community Centre At Hazrapur Jl-71, Plot-1524 Under Parulia Gp Apas Id- Apas/01/285/246/0004 2025-12-29
-Construction-Of-Road,-R.c.c-Drain,-Shifting-And-Laying-Of-Dws-Line-And-Conversion-Of-Overhead-To-Underground-Lt-Electrical-Line-Along-With-Street-Lighting-Under-Uidf-Phase-2-Including-Defects-Liability-Period>India -Construction-Of-Road,-R.c.c-Drain,-Shifting-And-Laying-Of-Dws-Line-And-Conversion-Of-Overhead-To-Underground-Lt-Electrical-Line-Along-With-Street-Lighting-Under-Uidf-Phase-2-Including-Defects-Liability-Period>Construction Of Roads Under Uidf Phase 2
Construction Of Road, R.c.c Drain, Shifting And Laying Of Dws Line And Conversion Of Overhead To Underground Lt Electrical Line Along With Street Lighting Under Uidf Phase 2 Including Defects Liability Period
-Construction-Of-Road,-R.c.c-Drain,-Shifting-And-Laying-Of-Dws-Line-And-Conversion-Of-Overhead-To-Underground-Lt-Electrical-Line-Along-With-Street-Lighting-Under-Uidf-Phase-2-Including-Defects-Liability-Period>2025-12-29
-Replacing-The-Age-Old-Pump-Motor-Set-No-2-At-Station-No-3-By-New-1.75-Mgh-Pump-And-6-Kv,-1150-Kw-Sq-Cage-Induction-Motor-In-Station-No-3-At-Tallah-Pumping-Station>India -Replacing-The-Age-Old-Pump-Motor-Set-No-2-At-Station-No-3-By-New-1.75-Mgh-Pump-And-6-Kv,-1150-Kw-Sq-Cage-Induction-Motor-In-Station-No-3-At-Tallah-Pumping-Station>Kmc/ws/tps/69/2025-2026
Replacing The Age Old Pump Motor Set No 2 At Station No 3 By New 1.75 Mgh Pump And 6 Kv, 1150 Kw Sq Cage Induction Motor In Station No 3 At Tallah Pumping Station
-Replacing-The-Age-Old-Pump-Motor-Set-No-2-At-Station-No-3-By-New-1.75-Mgh-Pump-And-6-Kv,-1150-Kw-Sq-Cage-Induction-Motor-In-Station-No-3-At-Tallah-Pumping-Station>2025-12-29
-Repairing-Of-Kitchen-Room-At-Dagal-Icds-Centre>India -Repairing-Of-Kitchen-Room-At-Dagal-Icds-Centre>Repairing Of Icds Centre
Repairing Of Kitchen Room At Dagal Icds Centre
-Repairing-Of-Kitchen-Room-At-Dagal-Icds-Centre>2025-12-29
-Installation-Of-04-Number-Solar-Lights-At-Different-Places-Of-Booth-No-72>India -Installation-Of-04-Number-Solar-Lights-At-Different-Places-Of-Booth-No-72>Installation Of Solar Street Light
Installation Of 04 Number Solar Lights At Different Places Of Booth No 72
-Installation-Of-04-Number-Solar-Lights-At-Different-Places-Of-Booth-No-72>2025-12-29
Whats app