Filter Search


Energy,-Power-and-Electrical


Location Summary Deadline
India Supply And Installation Of Indoor Wi-fi''''s, Wireless Lan Controllers And Layer 2 Access Switches Indoor Wi-fi''''s, Wireless Lan Controllers, Layer 2 Access Switches 2025-12-31
India Installation Of Solar Street Light (10 Nos) Near 1) Tapia Bibi 5 Nos 2) Robika 4 Nos 3) Rafikul 8 Nos. Within Booth No-151 Under Gobrachhara Nayarhat Gp Within Dinhata-ii Dev. Block ( Scheme Id Apas/01/007/151/0011) Sl No- 01 2025-12-31
India Installation Of Solar Light At 10 Different Places Ner 1) Lablu Miya 2) Nal Bari 3) Suman Barman And 7 Others Places Within Booth No. 169 Under Gobrachhara Nayarhat Gp Within Dinhata-ii Dev. Block( Scheme Id Apas/01/007/169/0004) Sl No- 19 2025-12-31
India Solar Light At (natun Pally Rupchabi Cinema Back Side) 9 No And Others 2025-12-31
India Construction Of Sub Division Office Building For Sutharpada Sub Division Under Dharampur Division Of Valsad Circle 2025-12-31
India Construction Of Sub Division Office Building For Khergam Sub Division Under Valsad Rural Division Of Valsad Circle 2025-12-31
India Construction Of Shopping Complex At Dallirajhara Road Ward 03 Bhanupratappur. 2025-12-31
India Construction Of A Panel For Retired Personnel From Government/semi-government Institutions For The Position Of Junior Engineer. 2025-12-31
India Polyester Enameled Round Copper Winding Wire .#* "polyester Enameled Round Copper Winding Wire Class - 130,grade - 2,mediu m Covering Conforming To Is: 13730 (part-34)/2000 (first Revision) Reaffirmed 2005 Size: 2 1 Swg (0.813 Mm.) Dia." [ Warranty Period 2025-12-31
India Set Of De & Nde Side End Shields With Grease Cup Suitable For 6308 Bearing With outlet For Excess Grease To M/s. Ranjan Make Mrb Motor. Note : One Sample Set should Be Got Approved Before Effecting Bulk Supply. .#* Set Of De & Nde Side End Shields With Gr 2025-12-31
Whats app