Filter Search


Energy,-Power-and-Electrical


Location Summary Deadline
Poland Replacement Of Power House General Purpose Equipment Control System With Dcs 2025-06-16
Latvia Nanocoating For Pem Electrolyzer Membranes 2025-06-16
Poland W - Execution Of Works; Kalisz Branch; Kepno, Construction Of A 0.4kv Cable Connection, Yakxs 4x70mm - 161mb, Replacement Of The 0.4kv Overhead Line With Asxsn 4x120mm - 153mb (181mb), Together With Connections To Asxsn 4x16mm - 22mb, Asxsn 2x25mm -24mb; 2025-06-16
Poland W - Execution Of Works; Gdansk Branch; Wejherowo - 2405021execution Of Works: Insertion Of The Krsn-p2 Connector Into The Existing Cable Line Loop (implemented On The Basis Of Obi/36/1804720) According To Wp-p/24/059657 + Map And Diagram. Works To Be Perf 2025-06-16
Poland W - Execution Of Works; Gdansk Branch; Wejherowo - 2401376execution Of Works: Weaving The Switchboard Into The Existing Line (according To Obi/36/2303366) And Construction Of A Connection To P1 And Further To P2 According To Wp-p/23/037499,005071 And Proj 2025-06-16
Poland W - Execution Of Works; Gdansk Branch; Wejherowo - 2404694execution Of Works: Replacement Of Zk With Krsn-p2 + P1 According To P/24/047893 And P/24/047894 + Map. Works To Be Performed With The Exception Of.; Wejherowo Rural Commune; Bolszewo (village) 2025-06-16
Poland W - Execution Of Works; Gdansk Branch; Wejherowo-2404661execution Of Works: Replacement Of Z-301 With Integrated Cable Cabinet Switchboard Krsn-p2/2f-nh2/2r-nh00/f According To P/24/056097 + Map. Works To Be Performed With The Exclusion Of.; Puck Rural Co 2025-06-16
Croatia Maintenance Of Plataans In The City Of Greb 2025-06-16
Afghanistan Procurement Of 11 Items Of Electrical Equipment For The 20 Kv Feeder Project Of The Ghaib Qalandar Route 2025-06-16
Afghanistan Provision Of 26 Items Of Equipment For The Electrification Project Of The Villages Of Wardak, Lower Dand, Ghori, Baghlan Province 2025-06-16
Whats app