Filter Search


Energy,-Power-and-Electrical


Location Summary Deadline
-Sinking-Of-200-Mm-(aal-Through)-Big-Dia-Tube-Well-Of-220-M-Deep-At-4th-Tube-Well-Source,-Interconnection-And-Laying-Of-Parallel/-Dedicated-Pipeline,-Construction-Of-3.60-Mtr.-X-3.00-Mtr.-Switch-Room-Cum>India -Sinking-Of-200-Mm-(aal-Through)-Big-Dia-Tube-Well-Of-220-M-Deep-At-4th-Tube-Well-Source,-Interconnection-And-Laying-Of-Parallel/-Dedicated-Pipeline,-Construction-Of-3.60-Mtr.-X-3.00-Mtr.-Switch-Room-Cum>Wbphed/ee/md/niet_13 Of 2025-2026, Sl. No. 09
Sinking Of 200 Mm (aal Through) Big Dia Tube Well Of 220 M Deep At 4th Tube Well Source, Interconnection And Laying Of Parallel/ Dedicated Pipeline, Construction Of 3.60 Mtr. X 3.00 Mtr. Switch Room Cum
-Sinking-Of-200-Mm-(aal-Through)-Big-Dia-Tube-Well-Of-220-M-Deep-At-4th-Tube-Well-Source,-Interconnection-And-Laying-Of-Parallel/-Dedicated-Pipeline,-Construction-Of-3.60-Mtr.-X-3.00-Mtr.-Switch-Room-Cum>2025-05-30
-Design,-Supplying,-Fabrication,-Erection-Commissioning-Including-3-(three)-Months-Trial-Run-Of-90-M3-Hr.-Capacity-Pressure-Type-Iron-Elimination-Plant-With-Construction-Of-Blower-Room-Backwash-Water-Disp>India -Design,-Supplying,-Fabrication,-Erection-Commissioning-Including-3-(three)-Months-Trial-Run-Of-90-M3-Hr.-Capacity-Pressure-Type-Iron-Elimination-Plant-With-Construction-Of-Blower-Room-Backwash-Water-Disp>Wbphed/ee/md/niet_13 Of 2025-2026, Sl. No. 12
Design, Supplying, Fabrication, Erection Commissioning Including 3 (three) Months Trial Run Of 90 M3 Hr. Capacity Pressure Type Iron Elimination Plant With Construction Of Blower Room Backwash Water Disp
-Design,-Supplying,-Fabrication,-Erection-Commissioning-Including-3-(three)-Months-Trial-Run-Of-90-M3-Hr.-Capacity-Pressure-Type-Iron-Elimination-Plant-With-Construction-Of-Blower-Room-Backwash-Water-Disp>2025-05-30
-Sinking-Of-200-Mm-(all-Through)-Big-Dia-Tube-Well-Of-150-M-Deep,-Dismantling-Of-Pump-House-And-Construction-Of-3.60-Mtr.-X-3.00-Mtr.-Switch-Room-Cum-Chlorine-Room-With-Water-Supply-And-Sanitary-Arrangeme>India -Sinking-Of-200-Mm-(all-Through)-Big-Dia-Tube-Well-Of-150-M-Deep,-Dismantling-Of-Pump-House-And-Construction-Of-3.60-Mtr.-X-3.00-Mtr.-Switch-Room-Cum-Chlorine-Room-With-Water-Supply-And-Sanitary-Arrangeme>Wbphed/ee/md/niet_13 Of 2025-2026, Sl. No. 19
Sinking Of 200 Mm (all Through) Big Dia Tube Well Of 150 M Deep, Dismantling Of Pump House And Construction Of 3.60 Mtr. X 3.00 Mtr. Switch Room Cum Chlorine Room With Water Supply And Sanitary Arrangeme
-Sinking-Of-200-Mm-(all-Through)-Big-Dia-Tube-Well-Of-150-M-Deep,-Dismantling-Of-Pump-House-And-Construction-Of-3.60-Mtr.-X-3.00-Mtr.-Switch-Room-Cum-Chlorine-Room-With-Water-Supply-And-Sanitary-Arrangeme>2025-05-30
-Construction-Of-Pump-House,-Sinking-Of-Big-Dia.-Tube-Well,-Inter-Connection,-Laying-Of-Parallel/-Dedicated-Pipeline-And-Fhtc-Of-Jagannathpur-Piped-Water-Supply-Scheme-At-Harishchandrapur-ii-Block-Of-Mald>India -Construction-Of-Pump-House,-Sinking-Of-Big-Dia.-Tube-Well,-Inter-Connection,-Laying-Of-Parallel/-Dedicated-Pipeline-And-Fhtc-Of-Jagannathpur-Piped-Water-Supply-Scheme-At-Harishchandrapur-ii-Block-Of-Mald>Wbphed/ee/md/niet_13 Of 2025-2026, Sl. No. 07
Construction Of Pump House, Sinking Of Big Dia. Tube Well, Inter Connection, Laying Of Parallel/ Dedicated Pipeline And Fhtc Of Jagannathpur Piped Water Supply Scheme At Harishchandrapur-ii Block Of Mald
-Construction-Of-Pump-House,-Sinking-Of-Big-Dia.-Tube-Well,-Inter-Connection,-Laying-Of-Parallel/-Dedicated-Pipeline-And-Fhtc-Of-Jagannathpur-Piped-Water-Supply-Scheme-At-Harishchandrapur-ii-Block-Of-Mald>2025-05-30
-Construction-Of-Pump-House-,sinking-Of-Big-Dia-Tube-Well,-Boundary-Wall,-Interconnection,-Laying-Distribution-Of-Upvc-Pipe-Line-And-Iep-With-Blower-Room-At-3rd-Tube-Well-Site-Of-Sultannagar-Piped-Water-S>India -Construction-Of-Pump-House-,sinking-Of-Big-Dia-Tube-Well,-Boundary-Wall,-Interconnection,-Laying-Distribution-Of-Upvc-Pipe-Line-And-Iep-With-Blower-Room-At-3rd-Tube-Well-Site-Of-Sultannagar-Piped-Water-S>Wbphed/ee/md/niet_13 Of 2025-2026, Sl. No. 08
Construction Of Pump House ,sinking Of Big Dia Tube Well, Boundary Wall, Interconnection, Laying Distribution Of Upvc Pipe Line And Iep With Blower Room At 3rd Tube Well Site Of Sultannagar Piped Water S
-Construction-Of-Pump-House-,sinking-Of-Big-Dia-Tube-Well,-Boundary-Wall,-Interconnection,-Laying-Distribution-Of-Upvc-Pipe-Line-And-Iep-With-Blower-Room-At-3rd-Tube-Well-Site-Of-Sultannagar-Piped-Water-S>2025-05-30
Nepal Upgrading And Maintenance Work Of Army Welfare Building, Kathmandu 2025-05-30
Ethiopia The Ministry Of Water And Energy, Now Invites Sealed Bids From Eligible Bidders For The Procurement Of Construction Of Civil Works, Supply And Installation Electromechanical Equipment 2025-05-30
Nepal Tender No. Klii-2081/082-em/st-10; Supply, Delivery, Installation, Testing And Commissioning Of Switchgear, Switchyard Equipment, Testing Instrument And Spare Parts 2025-05-30
-Construction-Of-Boundary-Wall-And-Design,-Supplying,-Fabrication,-Erection-Commissioning-Including-3-(three)-Months-Trial-Run-Of-100-M3hr.-And-30-M3hr.-Capacity-Pressure-Type-Iron-Elimination-Plant-With>India -Construction-Of-Boundary-Wall-And-Design,-Supplying,-Fabrication,-Erection-Commissioning-Including-3-(three)-Months-Trial-Run-Of-100-M3hr.-And-30-M3hr.-Capacity-Pressure-Type-Iron-Elimination-Plant-With>Wbphed/ee/md/niet_13 Of 2025-2026, Sl. No. 05
Construction Of Boundary Wall And Design, Supplying, Fabrication, Erection Commissioning Including 3 (three) Months Trial Run Of 100 M3hr. And 30 M3hr. Capacity Pressure Type Iron Elimination Plant With
-Construction-Of-Boundary-Wall-And-Design,-Supplying,-Fabrication,-Erection-Commissioning-Including-3-(three)-Months-Trial-Run-Of-100-M3hr.-And-30-M3hr.-Capacity-Pressure-Type-Iron-Elimination-Plant-With>2025-05-30
India Construction Anganwadi Bhawan Ward 3 2025-05-30
Whats app