Filter Search


Energy,-Power-and-Electrical


Location Summary Deadline
Philippines Installation/establishment Of Warning Signals/drrm Signals 2025-07-15
India Limit Switch. .#* Limit Switch ,model No: Llfm , Make: Bch Only. (for Hec Double Column Planning Machine F or Movement Of Main Table). [ Warranty Period: 30 Months After The Date Of Delivery ] ] 2025-07-15
India Thin Walled Flexible Elastomeric Single Core Cable With Copper conductor For Working Voltage Above 750 Volts Upto 1.8 Kv/3.0 Kv as Per Rdso Spec No. Elrs/spec/elc/0019, (rev.4) Of February 2018, Size 16 mm2, Colour- Red, Yellow, Blue & Black In Equal Quan 2025-07-15
Poland Development Of The Functional Usual Program For The Modernization Of The 110/15 Kv Power Station 2025-07-15
Afghanistan Preparing And Preparing The Arthy Transformer With Its Accessories Is Necessary For The East Stage Of Kabul. 2025-07-15
Poland Gpz Zator/connected – Etap Ii Construction Of The 15 Kv Cable Line On The Bbw085893 Slope Section – Spytkowice Castle [bbw30925] With The Zksn Cable Connection With Telemechanics – Construction-execution Project 2025-07-15
Bulgaria Assurance Of Access And Transmission Of Electricity Through The Electricity Distribution Network For The Needs Of The Dgs Krumovgrad For A Period Of 48 Months 2025-07-15
India Drilling Of Borewell Infront Syed Umar Masjid Installing Pump Motor And Laying Pipeline And Electrification Work In Ward No 6 Hiriyur Cmc Limits. 2025-07-15
Germany Equipment Work 2025-07-15
India Rate Contract For Period Of 1 Year For Procurement Of Turbine Spares For 210mw Units Of Btps Of Mahagenco. 2025-07-15
Whats app