Filter Search


Energy,-Power-and-Electrical


Location Summary Deadline
Uzbekistan Supply Of Equipment 2025-05-23
Hungary Maintenance Of Measuring Equipment 2025 2025-05-23
-Sinking-Of-200mm-(all-Through)-Big-Dia.-Tube-Well,-Interconnection,-Construction-Of-Pump-House,-Boundary-Wall-And-Allied-Works-Of-Mahil-Pwss-Under-Gazole-Block-Under-Malda-Division,-Phe-Dte,-Govt.-Of-West>India -Sinking-Of-200mm-(all-Through)-Big-Dia.-Tube-Well,-Interconnection,-Construction-Of-Pump-House,-Boundary-Wall-And-Allied-Works-Of-Mahil-Pwss-Under-Gazole-Block-Under-Malda-Division,-Phe-Dte,-Govt.-Of-West>Wbphed/ee/md/niet_10 Of 2025-2026, Sl.no.11
Sinking Of 200mm (all Through) Big Dia. Tube Well, Interconnection, Construction Of Pump House, Boundary Wall And Allied Works Of Mahil Pwss Under Gazole Block Under Malda Division, Phe Dte, Govt. Of West
-Sinking-Of-200mm-(all-Through)-Big-Dia.-Tube-Well,-Interconnection,-Construction-Of-Pump-House,-Boundary-Wall-And-Allied-Works-Of-Mahil-Pwss-Under-Gazole-Block-Under-Malda-Division,-Phe-Dte,-Govt.-Of-West>2025-05-23
-Design,-Supplying,-Fabrication,-Erection-And-Commissioning-Including-3-(three)-Months-Trial-Run-Of-30m3/hr.capacity-Pressure-Type-Iron-Elimination-Plant-With-Construction-Of-Blower-Room-And-Backwash-Water>India -Design,-Supplying,-Fabrication,-Erection-And-Commissioning-Including-3-(three)-Months-Trial-Run-Of-30m3/hr.capacity-Pressure-Type-Iron-Elimination-Plant-With-Construction-Of-Blower-Room-And-Backwash-Water>Wbphed/ee/md/niet_10 Of 2025-2026, Sl.no.20
Design, Supplying, Fabrication, Erection And Commissioning Including 3 (three) Months Trial Run Of 30m3/hr.capacity Pressure Type Iron Elimination Plant With Construction Of Blower Room And Backwash Water
-Design,-Supplying,-Fabrication,-Erection-And-Commissioning-Including-3-(three)-Months-Trial-Run-Of-30m3/hr.capacity-Pressure-Type-Iron-Elimination-Plant-With-Construction-Of-Blower-Room-And-Backwash-Water>2025-05-23
-Laying-Of-Parallel/-Dedicated-Pipeline,-Providing-Balance-Fhtc-Design,-Supplying,-Fabrication,-Erection-Commissioning-Including-3-(three)-Months-Trial-Run-Of-80-M3-Hr.-Capacity-Pressure-Type-Iron-Elimina>India -Laying-Of-Parallel/-Dedicated-Pipeline,-Providing-Balance-Fhtc-Design,-Supplying,-Fabrication,-Erection-Commissioning-Including-3-(three)-Months-Trial-Run-Of-80-M3-Hr.-Capacity-Pressure-Type-Iron-Elimina>Wbphed/ee/md/niet_11 Of 2025-2026, Sl. No. 11
Laying Of Parallel/ Dedicated Pipeline, Providing Balance Fhtc Design, Supplying, Fabrication, Erection Commissioning Including 3 (three) Months Trial Run Of 80 M3 Hr. Capacity Pressure Type Iron Elimina
-Laying-Of-Parallel/-Dedicated-Pipeline,-Providing-Balance-Fhtc-Design,-Supplying,-Fabrication,-Erection-Commissioning-Including-3-(three)-Months-Trial-Run-Of-80-M3-Hr.-Capacity-Pressure-Type-Iron-Elimina>2025-05-23
-Sinking-Of-200mm-(all-Through)-Big-Dia.-Tube-Well,-Replacement-Of-Big-Dia.-Tube-Well,-Construction-Of-Pump-House,-Boundary-Wall-Laying-Of-Parallel/-Dedicated-Pipeline-And-Providing-Balance-Fhtc-Of-Birjab>India -Sinking-Of-200mm-(all-Through)-Big-Dia.-Tube-Well,-Replacement-Of-Big-Dia.-Tube-Well,-Construction-Of-Pump-House,-Boundary-Wall-Laying-Of-Parallel/-Dedicated-Pipeline-And-Providing-Balance-Fhtc-Of-Birjab>Wbphed/ee/md/niet_11 Of 2025-2026, Sl. No. 18
Sinking Of 200mm (all Through) Big Dia. Tube Well, Replacement Of Big Dia. Tube Well, Construction Of Pump House, Boundary Wall Laying Of Parallel/ Dedicated Pipeline And Providing Balance Fhtc Of Birjab
-Sinking-Of-200mm-(all-Through)-Big-Dia.-Tube-Well,-Replacement-Of-Big-Dia.-Tube-Well,-Construction-Of-Pump-House,-Boundary-Wall-Laying-Of-Parallel/-Dedicated-Pipeline-And-Providing-Balance-Fhtc-Of-Birjab>2025-05-23
Singapore Major Infrastructure Works At Sembawang (contract 1) 2025-05-23
-Design,-Supplying,-Fabrication,-Erection-Commissioning-Including-3-(three)-Months-Trial-Run-Of-80-M3-Hr.-Capacity-Pressure-Type-Iron-Elimination-Plant-With-Construction-Of-Blower-Room-Backwash-Water-Disp>India -Design,-Supplying,-Fabrication,-Erection-Commissioning-Including-3-(three)-Months-Trial-Run-Of-80-M3-Hr.-Capacity-Pressure-Type-Iron-Elimination-Plant-With-Construction-Of-Blower-Room-Backwash-Water-Disp>Wbphed/ee/md/niet_11 Of 2025-2026, Sl. No. 04
Design, Supplying, Fabrication, Erection Commissioning Including 3 (three) Months Trial Run Of 80 M3 Hr. Capacity Pressure Type Iron Elimination Plant With Construction Of Blower Room Backwash Water Disp
-Design,-Supplying,-Fabrication,-Erection-Commissioning-Including-3-(three)-Months-Trial-Run-Of-80-M3-Hr.-Capacity-Pressure-Type-Iron-Elimination-Plant-With-Construction-Of-Blower-Room-Backwash-Water-Disp>2025-05-23
-Design,-Supplying,-Fabrication,-Erection-Commissioning-Including-3-(three)-Months-Trial-Run-Of-45-M3-Hr.-Capacity-Pressure-Type-Iron-Elimination-Plant-With-Construction-Of-Blower-Room-Backwash-Water-Disp>India -Design,-Supplying,-Fabrication,-Erection-Commissioning-Including-3-(three)-Months-Trial-Run-Of-45-M3-Hr.-Capacity-Pressure-Type-Iron-Elimination-Plant-With-Construction-Of-Blower-Room-Backwash-Water-Disp>Wbphed/ee/md/niet_11 Of 2025-2026, Sl. No. 05
Design, Supplying, Fabrication, Erection Commissioning Including 3 (three) Months Trial Run Of 45 M3 Hr. Capacity Pressure Type Iron Elimination Plant With Construction Of Blower Room Backwash Water Disp
-Design,-Supplying,-Fabrication,-Erection-Commissioning-Including-3-(three)-Months-Trial-Run-Of-45-M3-Hr.-Capacity-Pressure-Type-Iron-Elimination-Plant-With-Construction-Of-Blower-Room-Backwash-Water-Disp>2025-05-23
Norway 3-bym-2025 Establishment And Operation Of New Fast Charging Stations In Oslo Municipality 2025 2025-05-23
Whats app