Filter Search


Energy,-Power-and-Electrical


Location Summary Deadline
Germany Construction, Delivery And Assembly Of A Transformer Station On The Depot Of Rostock Ramed Railway Ag 2025-05-23
Germany Kau - New Lwl Connection Of Data Cabinets 2025-05-23
Spain Electrical Material Supply Contract For The City Of Navalcarnero (madrid). 2025-05-23
Spain Supply Of Electricity, In Low Voltage, High Voltage And Natural Gas To Dependencies And Facilities Of The City Of Alcázar De San Juan And Other Municipal Organizations. 2025-05-23
Niger Additional Development Work For The 10 Former Csis In Progress And Construction And Equipment Of 2 New Csis 2025-05-23
India Rate Contract For Rewinding And Core Staggering Of Bhel Make 6.6 Kv Motors Of Various Rating And Capacity In Ph-i, At Sgtps, Mppgcl, Birsinghpur. 2025-05-23
India Annual Work Contract For Providing Assistance In Day To Day Routine Or Breakdown Maintenance Of Electrical Equipments And Ht And Lt Motors Of Unit No. 1 And 2, 2x210 Mw, At Sgtps, Mppgcl, Birsinghpur . 2025-05-23
Germany 2013 Nea Notstrom Ve01 2025-05-23
United States 1560-01-316-5647 - Sheet,circuit Analo 2025-05-23
-Design,-Supplying,-Fabrication,-Erection-Commissioning-Including-3-(three)-Months-Trial-Run-Of-50-M3-Hr.-Capacity-Pressure-Type-Iron-Elimination-Plant-With-Construction-Of-Blower-Room-Backwash-Water-Disp>India -Design,-Supplying,-Fabrication,-Erection-Commissioning-Including-3-(three)-Months-Trial-Run-Of-50-M3-Hr.-Capacity-Pressure-Type-Iron-Elimination-Plant-With-Construction-Of-Blower-Room-Backwash-Water-Disp>Wbphed/ee/md/niet_11 Of 2025-2026, Sl. No. 06
Design, Supplying, Fabrication, Erection Commissioning Including 3 (three) Months Trial Run Of 50 M3 Hr. Capacity Pressure Type Iron Elimination Plant With Construction Of Blower Room Backwash Water Disp
-Design,-Supplying,-Fabrication,-Erection-Commissioning-Including-3-(three)-Months-Trial-Run-Of-50-M3-Hr.-Capacity-Pressure-Type-Iron-Elimination-Plant-With-Construction-Of-Blower-Room-Backwash-Water-Disp>2025-05-23
Whats app