Filter Search


Energy,-Power-and-Electrical


Location Summary Deadline
Switzerland New Building Residential Construction Brisgi, Baden - Bkp 230 Electrical Work 2025-05-19
Zimbabwe Supply & Installation Of Solar Streetlights 2025-05-19
-Supply,-Installation,-Testing-&-Commissioning-Of-Smps-Based-Integrated-Power-Supply-System(ips)-For-Interlocked-Lc-Gate-In-Re-Area-Confirming-On-Rdso-Spe>India -Supply,-Installation,-Testing-&-Commissioning-Of-Smps-Based-Integrated-Power-Supply-System(ips)-For-Interlocked-Lc-Gate-In-Re-Area-Confirming-On-Rdso-Spe>Supply Of Supply, Installation And Commissioning Of Smps Based Ips For Interlocked Lc Gate Etc.
Supply, Installation, Testing & Commissioning Of Smps Based Integrated Power Supply System(ips) For Interlocked Lc Gate In Re Area Confirming On Rdso Spe
-Supply,-Installation,-Testing-&-Commissioning-Of-Smps-Based-Integrated-Power-Supply-System(ips)-For-Interlocked-Lc-Gate-In-Re-Area-Confirming-On-Rdso-Spe>2025-05-19
-Supply-And-Commissioning-Of-Impact-Wrench--1-Inch-With-Following-Specification:-Max-Torque---530/1020/1800/2300nm,nut-Busting-Torque---2400nm,-Speed--0-950/0--1080/0-1370/0-1060-Battery-Type-Li-ion,>India -Supply-And-Commissioning-Of-Impact-Wrench--1-Inch-With-Following-Specification:-Max-Torque---530/1020/1800/2300nm,nut-Busting-Torque---2400nm,-Speed--0-950/0--1080/0-1370/0-1060-Battery-Type-Li-ion,>Supply Of Supply And Commissioning Of Impact Wrenc
Supply And Commissioning Of Impact Wrench- 1 Inch With Following Specification: Max Torque - 530/1020/1800/2300nm,nut Busting Torque - 2400nm, Speed- 0-950/0- 1080/0-1370/0-1060 Battery Type Li-ion,
-Supply-And-Commissioning-Of-Impact-Wrench--1-Inch-With-Following-Specification:-Max-Torque---530/1020/1800/2300nm,nut-Busting-Torque---2400nm,-Speed--0-950/0--1080/0-1370/0-1060-Battery-Type-Li-ion,>2025-05-19
-Set-Of-Connectors-For-Cab-Air-Conditioner-Unit-In-Wap7-Locomotives-Consisting-Of-The-Following-Connectors-1)14-Pin-Box-Mounting-Receptacle-Male--Ms-3102r-20-27p-Fr-A30--01-Nos-2)14-Pin-Straight-Cable-Onnector>India -Set-Of-Connectors-For-Cab-Air-Conditioner-Unit-In-Wap7-Locomotives-Consisting-Of-The-Following-Connectors-1)14-Pin-Box-Mounting-Receptacle-Male--Ms-3102r-20-27p-Fr-A30--01-Nos-2)14-Pin-Straight-Cable-Onnector>Supply Of Set Of Connectors For Cab Air
Set Of Connectors For Cab Air Conditioner Unit In Wap7 Locomotives Consisting Of The Following Connectors 1)14 Pin Box Mounting Receptacle Male- Ms 3102r 20-27p Fr A30- 01 Nos 2)14 Pin Straight Cable Onnector
-Set-Of-Connectors-For-Cab-Air-Conditioner-Unit-In-Wap7-Locomotives-Consisting-Of-The-Following-Connectors-1)14-Pin-Box-Mounting-Receptacle-Male--Ms-3102r-20-27p-Fr-A30--01-Nos-2)14-Pin-Straight-Cable-Onnector>2025-05-19
-Friction-Snubber-Assembly-With-Top-And-Bottom-Rubber-Washer-Drawing-No.-(1)-Cg-k4014-Alt.-nil-Item-No.-1-(2)-Cg-k4015-Alt-nil-Item-No.-3-To-5.-Matl.-&-Spec.-As-Per-Drg.-[-Warranty-Period:-30-Months-After-The-Date>India -Friction-Snubber-Assembly-With-Top-And-Bottom-Rubber-Washer-Drawing-No.-(1)-Cg-k4014-Alt.-nil-Item-No.-1-(2)-Cg-k4015-Alt-nil-Item-No.-3-To-5.-Matl.-&-Spec.-As-Per-Drg.-[-Warranty-Period:-30-Months-After-The-Date>Supply Of Friction Snubber Assembly
Friction Snubber Assembly With Top And Bottom Rubber Washer Drawing No. (1) Cg-k4014 Alt.-nil Item No. 1 (2) Cg-k4015 Alt-nil Item No. 3 To 5. Matl. & Spec. As Per Drg. [ Warranty Period: 30 Months After The Date
-Friction-Snubber-Assembly-With-Top-And-Bottom-Rubber-Washer-Drawing-No.-(1)-Cg-k4014-Alt.-nil-Item-No.-1-(2)-Cg-k4015-Alt-nil-Item-No.-3-To-5.-Matl.-&-Spec.-As-Per-Drg.-[-Warranty-Period:-30-Months-After-The-Date>2025-05-19
Germany Digital Boards 2025-05-19
Philippines Supply And Delivery Of Const. Materials For The Upgrading Of Electrical Power System Of Super Health Center And Evac Facility Mun. Grounds 2025-05-19
United States "proposal – Solar Photovoltaic System" 2025-05-19
Switzerland Bkp23 Electrical Work, Stansstad Company Building 2025-05-19
Whats app