Filter Search


Energy,-Power-and-Electrical


Location Summary Deadline
India Repair Of 12 Ls Quarter (ncb Block-04) At Police Line, Bhagalpur In The District Of Bhagalpur - With Electrification 2025-12-24
India Essential Lubricating Items .#* Set Of Essential Lubricating Items For Maintenance Of Plug Door Of Vande Bharat Train. Specif ication As Per Annexure-i Attached. Quantity Required Per Set: (i) Isoflex Lds 18 Special A, Part Number-n 300160r08 Quantity- 15 2025-12-24
India Govt Sr. Sec. School 1 Fd One Classroom, Science Lab And Library Room Construction Work 2025-12-24
India Gram Panchayat Arjungowan Me Samudaik Bhawan Nirman 2025-12-24
India Gram Panchayat Dhigsara Me Samudaik Bhawan Nirman 2025-12-24
India E-tender For 05 No. T/w Work U/n Pachpedi D/c Of (o&m) Divison Bilaspuur U/n Project Dn. Bilaspur. 2025-12-24
-Supplying,-Installation,-Testing,-Commissioning-And-Energization-Of-400-Kva-33-11/0.433-Kv-Transformer-And-Balance-L.t.-Lines-With-All-Other-Allied-Items-In-Sector-75-Faridabad.-(including-Defect-Liability-6-Year-For-Transf>India -Supplying,-Installation,-Testing,-Commissioning-And-Energization-Of-400-Kva-33-11/0.433-Kv-Transformer-And-Balance-L.t.-Lines-With-All-Other-Allied-Items-In-Sector-75-Faridabad.-(including-Defect-Liability-6-Year-For-Transf>Hew-555 Sector-75 Balance
Supplying, Installation, Testing, Commissioning And Energization Of 400 Kva 33-11/0.433 Kv Transformer And Balance L.t. Lines With All Other Allied Items In Sector-75 Faridabad. (including Defect Liability 6 Year For Transf
-Supplying,-Installation,-Testing,-Commissioning-And-Energization-Of-400-Kva-33-11/0.433-Kv-Transformer-And-Balance-L.t.-Lines-With-All-Other-Allied-Items-In-Sector-75-Faridabad.-(including-Defect-Liability-6-Year-For-Transf>2025-12-24
India Construction Of Skill Development Centre Building At Ghumarwin District Bilaspur Hp Including Internal External Water Supply Sanitary Installation Development Of Site Construction Of 10000 Liters Capacity Rain Water Harvesting Tank And Co 100 Users 2025-12-24
India Construction Of New First Floor Office Building In New Godown And Other Works At State Warehouse Kozhinjampara In Palakkad District Under Nabard Wif Scheme 2025-12-24
-Civil-And-Electrical-Works-For-The-Installation-Of-Flake-Ice-Unit>India -Civil-And-Electrical-Works-For-The-Installation-Of-Flake-Ice-Unit>Pmmsy - Cold Storage Of 10t Capacity - Pallithura Base Station - Flake Ice - Civil And Electrical
Civil And Electrical Works For The Installation Of Flake Ice Unit
-Civil-And-Electrical-Works-For-The-Installation-Of-Flake-Ice-Unit>2025-12-24
Whats app