Filter Search


Energy,-Power-and-Electrical


Location Summary Deadline
India Repair/overhauling Of Koel Make Dg Set-a Of Power Car No 231414, Engine No dvo.9026/2320022, Model Dv10tag At Ash/ljn Depot Of Ljn Division. 2025-12-26
India Electrification, Wiring, Lighting And Separate Power Supply Arrangement Of Block-c and Left Over Electrical Work At Pataliputra Rail Parisar Digha Patna And Any Other location Under Dy.cee/con/n/spj 2025-12-26
India (i)provision For Construction Of New Building At Canning Running Room And Ladies room In Existing Running Room Of Namkhana & Canning Including All Ancillary works For Lakshmikantapur, Diamond Harbour, Namkhana And Canning Existing running Room In The Juri 2025-12-26
India Supply And Installation Of 16mtr High Mast Light 2025-12-26
India Supply And Installation Of 12.5 Mtr High Mast Light 2025-12-26
India Carrying Out Periodical Maintenance And Attending Failures Of 49 Nos. Kirloskar make Environment Friendly Dg Sets (12.5kva, 34 Nos., 15kva-13 Nos. & 40kva- 02nos.) For A Period Of 01 (one) Year In Myd-dca (12.5kva-34 Nos) & Cne-bpb-scl (15kva-13 Nos. & 40 2025-12-26
India Sagar-provision Of Additional Room (prefeb) In Running Room Sagar Under Aden sagar Sub-division. 2025-12-26
India Part-a) Shifting Of Existing 33/0.4kv Substation No-2 From West Colony Bhopal To new Location. Part-b) Bhopal- Construction Of Rpf Post Building Platform No.1 With furniture. 2025-12-26
India Electrical Work In Connection With The Work Of "chunar Jn. Provision Of Additional 6.10 M Fob With Other Connected Works At Chunar (car) Station Of Prayagraj division. Electrical Work In Connection With The Work Of "pryj : Raising Of Platform no 3/4 To Hi 2025-12-26
India Electrical Work In Connection With The Work Of "prayagraj: Raising Of Platform No. 1 & 2 To High Level For Recoupment Of Shortfall In Minimum Essential Amenities (mea) at Sjt Stn Under Aden/l/pryj. Prayagraj: Raising Of Platform No. 1 & 2 To High Level fo 2025-12-26
Whats app