Filter Search


Energy,-Power-and-Electrical


Location Summary Deadline
India Estimate For Replacement Of Damaged Lt Distribution Box Of Various Capacity Of Existing Transformer Located At Ruchi Riya Sari Changorabhata Manjeet Green City Nandu Kirana Ke Samne Changorabhata Basti Under Changorabhata Zone City Dn. West Raipur. 78-33p 2025-07-09
India Estimate For P/s Load Enhancement To 12kw To 22kw Conn .to Atc Telecom Infrastructure At Vill- Musrakala U/n Musrakala D/c.esttimate For Sgp Kusmi Chlorinator Pump At Vill- Chhotekusmi U/n Musrakala D/c. 2025-07-09
India Estimate For Electrification Mt-missionpara Of Village Bagra U/n Ramanujganj D/c Under (o&m)dn. Balrampur.a497805125.0018 Dt.09.05.2025 2025-07-09
India Revise Estimate For Replacement Of Damaged 33 Kv Ab Cable Termination Set & Straightthourgh Joint At Different Location Under City Dn.ii West Cspdcl Bilaspur. 2025-07-09
India Estimate For Agumentation Of 100kva 11/0.4kv Xmer To 200kva 11/0.4kv Installed At Near Mahaveer Apartment Bilaspur Under Nehru Nagar Zone City Division-2(west),bilaspur. 2025-07-09
India Estimate For Providing Of 53 Nos. Nsc (bpl) Connection At Vill. - Lodhena & Providing Of 70 Nos. Nsc (bpl) Connection At Vill. - Dobh Under Sanna D/c Under (o&m) Dn. Cspdcl , Jashpur . 2025-07-09
India Estimate For Replacement Of 06 Nos. Ab Switch (not Repairable) At Various Locations Under Kartala Dc Of (o&m) Dn. Korba 2025-07-09
India Tender For Various Work At Various Locations Of Korba S/d Under O&m Dn Korba 2025-07-09
India Estimate For Interlinking Of Line To Shorten The Lenght Of 11 Kv Nonbirra Feeder For Village Kerwadwari Under Bhaisma Dc. Pr No.10068990 Estt. No. B467603225.0001 Dt. 05.06.2025 2025-07-09
India Est. For 01 No. Ip Conn. Work To Lakhan Lal Suryawanshi At Masturi U/n Masturi D/c, A E (d) Masturi.p.r. No. 10068716 2025-07-09
Whats app