Filter Search


Energy,-Power-and-Electrical


Location Summary Deadline
-Necessary-Power-Supply-Arrangement-By-Dg-Set-To-Oparate-Submersible-Pumps-For-Dewatering-And-Sufficient-Lighting-During-Lifting-Of-Broken-Spindle-With-Wage-And-Covering-The-Valve-Body-With-Blank-Plate-Of-1800mm-Dia-Sluice>India -Necessary-Power-Supply-Arrangement-By-Dg-Set-To-Oparate-Submersible-Pumps-For-Dewatering-And-Sufficient-Lighting-During-Lifting-Of-Broken-Spindle-With-Wage-And-Covering-The-Valve-Body-With-Blank-Plate-Of-1800mm-Dia-Sluice>Ee/ws/grww/rwps/25-26/et-10
Necessary Power Supply Arrangement By Dg Set To Oparate Submersible Pumps For Dewatering And Sufficient Lighting During Lifting Of Broken Spindle With Wage And Covering The Valve Body With Blank Plate Of 1800mm Dia Sluice
-Necessary-Power-Supply-Arrangement-By-Dg-Set-To-Oparate-Submersible-Pumps-For-Dewatering-And-Sufficient-Lighting-During-Lifting-Of-Broken-Spindle-With-Wage-And-Covering-The-Valve-Body-With-Blank-Plate-Of-1800mm-Dia-Sluice>2025-07-07
India Providing Boundary Demarcation Using Rcc Poles Along The Line Corridor In The Forest Land To The Length Of 5.092km In Respect Of The Work Of Laying 110kv Dc Line On Dc Towers Using Panther Conductor From Existing 110/33/11kv Guruvayanakere Sub-station To 2025-07-07
India Glass Fuse (fast Blow) .#* Glass Fuse (fast Blow) 6.3a 440v Of Size 5x30mm As Per Edts 103 Rev-d For Lhb Ac & Power Car. Make: Wickmann/rs Component Only As Per Sr.no.7 Of Bom Of Edts 103 Rev-d [ Warrant y Period: 24 Months After The Date Of Delivery ] ] 2025-07-07
India Improved Design Silica Breather Assly. .#* Improved Design Silica Breather Assly For Loco Transformer Type Hett 3900 & 5 400 As Per Rdso Drg. No. Skel- 4895 Rev.-01 [ Warranty Period: 30 Months After The Date Of Delivery ] [quantity Tolerance (+/-): 5 %ag 2025-07-07
India Ioh Replacement Kit For New 22cb .#* Ioh Replacement Kit For New 22cb Schneider Make Vcb With New Part Code No. Mfr38246 with Additional Auxiliary Switch. As Per Annexure Attached. [ Warranty Period: 30 Months After The Date O f Delivery ] ] 2025-07-07
India Supply Of Set Of Tools And Tackles To Facilitate For Rewinding Of 3-phase Stator Type 6fra-6068. One Set Consisting Of 12 Items As Per Annexure- "a". .#* Supply Of Set Of Tools And Tackles To Facilitate For Rewinding Of 3-phase Stator Type 6fra-60 68. One 2025-07-07
India Protective Cap To Kbi Part No. B75404 .#* Protective Cap To Kbi Part No. B75404 Along With Breather Plug To Kbi Part No. B66529/5 Or E quivalent Of Faiveley/escorts/kb Or Equivalent. [ Warranty Period: 30 Months After The Date Of Delivery ] ] 2025-07-07
India Terminal Block For Aux Motors Of Wag-9 Loco. One Set Consists Of 02 Items In 03 nos. As Follows: - (1) Epoxy Moulded Terminal Block M8 For Aux Motors As Per Rdso drg. No. Skel-2754a Or Clw/es/3/sk-1/0454, Qty-01 No. (2) Epoxy Moulded terminal Block M6 For 2025-07-07
India Electrical Signal Exchange System For Three Phase Locomotives As Per modification Sheet No.rdso/2018/el/ms/0470. Each System Consists Of -(i) Two sets Led Lights. (ii) Operating Panel / Switches For Loco Pilot And Assistant Loco pilot Separately And (iii) 2025-07-07
India Mobile Contacts Assembly (r Y B Phase Pin) Inter Vehicular Coupler 500 Amp capacity As Per Rcf Drawing No Lw71316 Alt- B And Confirming To Rdso specification No. Rdso/pe/spec/ac/0177-2013 (rev-1) Suitable For 3 Phase Locos equipped Hog Converter. .#* Mobi 2025-07-07
Whats app