Filter Search


Energy,-Power-and-Electrical


Location Summary Deadline
India Construction Of Office Room For Swm Project At Matla-ii Gram Panchayat Office Under Matla-ii Gp Under Canning-i Dev. Block 2025-07-09
India Construction Of 33/11 Kv, 2x3.15 Mva Sub-station At Bum (unmanned) With Associated 33 Kv And 11 Kv Lines Under Ed, Hpsebl Ghumarwin On Turnkey Basis. (nit-05/2025-26) 2025-07-09
-Liftingtransportingcomplete-Rewinding-Replacement-Of-Motor-De-Nde-Bearing,-Fabrication-Of-Motor-End-Cover-Bearing-Sleeve-And-Air-Washer-Unit-Blower-Motor-A>India -Liftingtransportingcomplete-Rewinding-Replacement-Of-Motor-De-Nde-Bearing,-Fabrication-Of-Motor-End-Cover-Bearing-Sleeve-And-Air-Washer-Unit-Blower-Motor-A>Ot 9/25-26
Liftingtransportingcomplete Rewinding Replacement Of Motor De Nde Bearing, Fabrication Of Motor End Cover Bearing Sleeve And Air Washer Unit Blower Motor A
-Liftingtransportingcomplete-Rewinding-Replacement-Of-Motor-De-Nde-Bearing,-Fabrication-Of-Motor-End-Cover-Bearing-Sleeve-And-Air-Washer-Unit-Blower-Motor-A>2025-07-09
-Erection-Of-11-Kv-Link-Line-Between-Authoor-#-And-Mukkani-#-With-2-Nos.-Mini-Towers-In-Palayakayal-Section>India -Erection-Of-11-Kv-Link-Line-Between-Authoor-#-And-Mukkani-#-With-2-Nos.-Mini-Towers-In-Palayakayal-Section>Erection Of 11 Kv Link Line Between Authoor # And Mukkani # With 2 Nos. Mini Towers In Palayakayal
Erection Of 11 Kv Link Line Between Authoor # And Mukkani # With 2 Nos. Mini Towers In Palayakayal Section
-Erection-Of-11-Kv-Link-Line-Between-Authoor-#-And-Mukkani-#-With-2-Nos.-Mini-Towers-In-Palayakayal-Section>2025-07-09
India Construction Of Farmers Knowledge Centre At Baganbazar Under Kalyanpur Agri Sub Division Khowai District (rkvy) (balance Portion) 2025-07-09
-Electrical-Maintenance-And-Repairing-Work-Of-All-Electrical-Installations-At-Mayurakshi-Bhawan,-Office-Complex-And-Colony,-Scada-Building-Incl-Operation-Of-Dg-Set-For-Mayurakshi-Bhawan-And-Centrifugal-Pump-At-Massanjor>India -Electrical-Maintenance-And-Repairing-Work-Of-All-Electrical-Installations-At-Mayurakshi-Bhawan,-Office-Complex-And-Colony,-Scada-Building-Incl-Operation-Of-Dg-Set-For-Mayurakshi-Bhawan-And-Centrifugal-Pump-At-Massanjor>Wbiw/ee/memd/enit-05/2025-26/4
Electrical Maintenance And Repairing Work Of All Electrical Installations At Mayurakshi Bhawan, Office Complex And Colony, Scada Building Incl Operation Of Dg Set For Mayurakshi Bhawan And Centrifugal Pump At Massanjor
-Electrical-Maintenance-And-Repairing-Work-Of-All-Electrical-Installations-At-Mayurakshi-Bhawan,-Office-Complex-And-Colony,-Scada-Building-Incl-Operation-Of-Dg-Set-For-Mayurakshi-Bhawan-And-Centrifugal-Pump-At-Massanjor>2025-07-09
-Sitc-Of-2-Nos-Split-Ac-Machine-With-Allied-Electrical-Works-In-Triage-Room-Of-Sncu-At-Bishnupur-District-Hospital,-Bishnupur.>India -Sitc-Of-2-Nos-Split-Ac-Machine-With-Allied-Electrical-Works-In-Triage-Room-Of-Sncu-At-Bishnupur-District-Hospital,-Bishnupur.>Wbpwdte/ae/besd-i/e-niq 05 Of 2025-26
Sitc Of 2 Nos Split Ac Machine With Allied Electrical Works In Triage Room Of Sncu At Bishnupur District Hospital, Bishnupur.
-Sitc-Of-2-Nos-Split-Ac-Machine-With-Allied-Electrical-Works-In-Triage-Room-Of-Sncu-At-Bishnupur-District-Hospital,-Bishnupur.>2025-07-09
-Electrical-Maintenance-Work-Of-All-Electrical-Installations-At-Khoai-Inspection-Banglow-And-Its-Campus,-South-Canals-Division-Office,-Sub-division-Office,-Colonys,-Shyambati-Garden-And-Kankalitala-Check-Dam-At-Bolpur.>India -Electrical-Maintenance-Work-Of-All-Electrical-Installations-At-Khoai-Inspection-Banglow-And-Its-Campus,-South-Canals-Division-Office,-Sub-division-Office,-Colonys,-Shyambati-Garden-And-Kankalitala-Check-Dam-At-Bolpur.>Wbiw/ee/memd/enit-05/2025-26/6
Electrical Maintenance Work Of All Electrical Installations At Khoai Inspection Banglow And Its Campus, South Canals Division Office, Sub-division Office, Colonys, Shyambati Garden And Kankalitala Check Dam At Bolpur.
-Electrical-Maintenance-Work-Of-All-Electrical-Installations-At-Khoai-Inspection-Banglow-And-Its-Campus,-South-Canals-Division-Office,-Sub-division-Office,-Colonys,-Shyambati-Garden-And-Kankalitala-Check-Dam-At-Bolpur.>2025-07-09
-Electrical-Maintenance-Work-Of-All-Electrical-Installation-Of-All-Irrigation-Office-Building,-Bungalow,-Quality-Control-Office,-Staff-Quarters-Etc.-At-Berhampore-Under-Irrigation-And-Waterways-Directorate-During-The-Ye>India -Electrical-Maintenance-Work-Of-All-Electrical-Installation-Of-All-Irrigation-Office-Building,-Bungalow,-Quality-Control-Office,-Staff-Quarters-Etc.-At-Berhampore-Under-Irrigation-And-Waterways-Directorate-During-The-Ye>Wbiw/ee/memd/enit-05/2025-26/3
Electrical Maintenance Work Of All Electrical Installation Of All Irrigation Office Building, Bungalow, Quality Control Office, Staff Quarters Etc. At Berhampore Under Irrigation And Waterways Directorate During The Ye
-Electrical-Maintenance-Work-Of-All-Electrical-Installation-Of-All-Irrigation-Office-Building,-Bungalow,-Quality-Control-Office,-Staff-Quarters-Etc.-At-Berhampore-Under-Irrigation-And-Waterways-Directorate-During-The-Ye>2025-07-09
India Installation Of Low Mast Light At Herobhanga Bazar Under Gopalpur Gram Panchayat Under Canning-i Dev. Block 2025-07-09
Whats app