Filter Search


Energy,-Power-and-Electrical


Location Summary Deadline
-Gp-Requirements-And-Service>India -Gp-Requirements-And-Service>Annual Solar Street Light Service And Purchase For The Year Of 2025-26
Gp Requirements And Service
-Gp-Requirements-And-Service>2025-12-24
India Supply Of Test Terminal Block (ttb) 3p-4w. 2025-12-24
Kazakhstan Competition No. 2078954 add To Favorites wire Sip-4 2?16 2025-12-24
Bangladesh Straightening Of Leaning Poles Of 11/0.4 And 0.4 Kv Lines, Re-installation Of Guy Assemblies And Retention Of Conductor To Reduce Sag Along With Other Necessary Urgent Maintenance And Renovation Works Of 11 Kv Khadim Feeder Under Sales & Distribution Divi 2025-12-24
Bangladesh Straightening Of Leaning Poles Of 11/0.4 And 0.4 Kv Lines, Re-installation Of Guy Assemblies And Retention Of Conductor To Reduce Sag Along With Other Necessary Urgent Maintenance And Renovation Works Of 11 Kv Majortila Feeder Under Sales & Distribution D 2025-12-24
Bangladesh Straightening Of Leaning Poles Of 11/0.4 And 0.4 Kv Lines, Re-installation Of Guy Assemblies And Retention Of Conductor To Reduce Sag Along With Other Necessary Urgent Maintenance And Renovation Works Of 11 Kv Bscic Feeder Under Sales & Distribution Divis 2025-12-24
Bangladesh Urgent Maintenance And Renovation Works Of 33 Kv Line From South Surma To Botesshwor Under Sales & Distribution Division-5 Bpdb Sylhet. 2025-12-24
Bangladesh Installation Of Cc Camera And Replacement Work Of Electric Wires & Poles At Shaktola Bwdb Colony Under Cumilla Wd Division, Bwdb,cumilla During The Year 2025-26. 2025-12-24
Bangladesh Straightening Of Leaning Poles Of 11/0.4 And 0.4 Kv Lines, Re-installation Of Guy Assemblies And Retention Of Conductor To Reduce Sag Along With Other Necessary Urgent Maintenance And Renovation Works Of 11 Kv Shahporan Feeder Under Sales & Distribution D 2025-12-24
Bangladesh Urgent Maintenance And Renovation Works Of 33 Kv Line From Kumargaon To Botesshwor Under Sales & Distribution Division-5 Bpdb Sylhet. 2025-12-24
Whats app