Filter Search


Energy,-Power-and-Electrical


Location Summary Deadline
India Supply & Fitment Of 2 Amp. 2 Pole Dc Mcb (c Curve) .#* Supply & Fitment Of 2 Amp. 2 Pole Dc Mcb (c Curve) Along With Limit Module (conversion Of F ds System To Comply To Modified Clause 1.7 (a) Of Rdso Specifications Rdso/2008/cg-04 Rev-6 Amd-1 Of T he Fd 2025-07-15
India Rectifier Assembly Battery Charging Emd Pt.no. 8479400, Dlw Pt.no. 18000137. .#* Rectifier Assembly Battery Charging Emd Pt.no. 8479400, Dlw Pt.no. 1800013 7. [ Warranty Period: 30 Months After The Date Of Delivery ] [quantity Tolerance (+/-): 5 %age , It 2025-07-15
India Male Stud Connector .#* Male Stud Connector To Ermeto Part No. Ge22llr3/4kegcf Or Equivalent And Confirming To Rcf Drawing No. Lw36189. Item 12, Alt. Nil. [ Warranty Period: 30 Months After The Date Of Delivery ] ] 2025-07-15
Germany Renewing The Switchgear In The Waterworks Row 2025-07-15
Germany Examination Of The Local Festival And Local Electrical Bm 2025-07-15
India Tenders For 500 Mw Rooftop Solar Projects In Five States For 30 Mw Of Distributed Grid Connected Rooftop Solar Systems On Government Buildings In Goa. 2025-07-15
India Ratlam Division : Ratlam - Provision Of Smart Energy Metering For Railway Quarters And Outsiders. 2025-07-15
India Electrical General Service Portion Of Work In Connection With Construction Of divisional Eng. Training Center At Solapur. (reinvitation) 2025-07-15
India Electrical General Service Portion Of Work In Connection With Provision Of Highmast lighting At 6 Goods Shed Along Lighting Arrangement At Track Side At 5 Goods Shed located Over Solapur Division.(reinvitation) 2025-07-15
India Complete Overhauling Including Repairing Of Defective Parts Of One No. Of 220kv/27kv, 21.6mva Traction Power Transformer (m/s Abb Make) At Nagothane tss Of Mumbai Division Of Central Railway. 2025-07-15
Whats app