Filter Search


Energy,-Power-and-Electrical


Location Summary Deadline
Denmark Replacement Building For Agerbækhuse, Mellemarksvej 11, Herfolle 2025-06-02
India Execution Of Signaling & Telecommunication Work In Connection With: (1) Providing And Erecting W-beam Type Metal Fencing Along The Track From Km 722.00 To 867.000 To Prevent Cro Between Bsp-durg Section, (2) Reliability Improvement Of Earthing Over Raipur 2025-06-02
India Stripping Of Mechanical & Electrical Items And Supply & Fitment All Interior Furnishing Items Such As Paneling, Seat & Berth, Passenger Amenities Items Such As Pu Ladder, Signages, Pvc, Windows, Main Door, Entrance Hand Rail, End Wall Door, Communication 2025-06-02
India Provision Of Iot Devices / Ifd For Integration Of Electrical General Service Assets With Ir-niyantrak Phase-1 2025-06-02
India Temporary Lighting Requirments /illumination For Festivals(durga Puja, Diwali , Christmas, New Year/other National And All Other Festive Occasions) /departmental Programs/inaurgation Functions At Santraghachi Station, Shalimar Station And Other Station Bu 2025-06-02
-Copper-Welding-Cable-70-Sq.mm/454-Amp.-]>India -Copper-Welding-Cable-70-Sq.mm/454-Amp.-]>Tender Invited For Copper Welding Cable 70 Sq.mm/454 Amp.
Copper Welding Cable 70 Sq.mm/454 Amp. ]
-Copper-Welding-Cable-70-Sq.mm/454-Amp.-]>2025-06-02
-Main-Air-Compressor-(air-Generation-And-Treatment-Unit,-Oil-Free-Long-Which-Modular-Mounting-Frame-Assembled-With-3-Phase-Induction-Motor,cooler-Unit-&-Air-Dryer,etc)-Suitable-For-25kv-3-Phase-Ac-Memu-(medha)-I>India -Main-Air-Compressor-(air-Generation-And-Treatment-Unit,-Oil-Free-Long-Which-Modular-Mounting-Frame-Assembled-With-3-Phase-Induction-Motor,cooler-Unit-&-Air-Dryer,etc)-Suitable-For-25kv-3-Phase-Ac-Memu-(medha)-I>Tender Invited For Main Air Compressor
Main Air Compressor (air Generation And Treatment Unit, Oil Free Long Which Modular Mounting Frame Assembled With 3 Phase Induction Motor,cooler Unit & Air Dryer,etc) Suitable For 25kv 3 Phase Ac Memu (medha) I
-Main-Air-Compressor-(air-Generation-And-Treatment-Unit,-Oil-Free-Long-Which-Modular-Mounting-Frame-Assembled-With-3-Phase-Induction-Motor,cooler-Unit-&-Air-Dryer,etc)-Suitable-For-25kv-3-Phase-Ac-Memu-(medha)-I>2025-06-02
-Supply-Installation-Testing-&-Commissioning-Of-Occupancy-Sensor-Working-On-Pir-Technology-Abs-Cabinet-Of-Sensor-Crca-Sheet-Box-10"-X-12"-Control-Panel-With-Contactor-25a-Metallice-Plug-Top-And-Bypass-Mcb,-Rated-Vo>India -Supply-Installation-Testing-&-Commissioning-Of-Occupancy-Sensor-Working-On-Pir-Technology-Abs-Cabinet-Of-Sensor-Crca-Sheet-Box-10"-X-12"-Control-Panel-With-Contactor-25a-Metallice-Plug-Top-And-Bypass-Mcb,-Rated-Vo>Tender Invited For Occupancy Sensor
Supply Installation Testing & Commissioning Of Occupancy Sensor Working On Pir Technology Abs Cabinet Of Sensor Crca Sheet Box 10" X 12" Control Panel With Contactor 25a Metallice Plug Top And Bypass Mcb, Rated Vo
-Supply-Installation-Testing-&-Commissioning-Of-Occupancy-Sensor-Working-On-Pir-Technology-Abs-Cabinet-Of-Sensor-Crca-Sheet-Box-10"-X-12"-Control-Panel-With-Contactor-25a-Metallice-Plug-Top-And-Bypass-Mcb,-Rated-Vo>2025-06-02
-Motor-For-Main-Compressor-As-Per-Rdso-Spec.-No.--E10/3/09-(motor)-With-Amendment-Nos.--01-To-06,clw-Spec.-No.-clw/es/3/0100-(alt.-e)-.-[-Warranty-Period:-30-Months-After-Th>India -Motor-For-Main-Compressor-As-Per-Rdso-Spec.-No.--E10/3/09-(motor)-With-Amendment-Nos.--01-To-06,clw-Spec.-No.-clw/es/3/0100-(alt.-e)-.-[-Warranty-Period:-30-Months-After-Th>Tender Invited For Motor For Main Compressor As Per Rdso Spec. No.- E10/3/09
Motor For Main Compressor As Per Rdso Spec. No.- E10/3/09 (motor) With Amendment Nos.- 01 To 06,clw Spec. No.-clw/es/3/0100 (alt.-e) . [ Warranty Period: 30 Months After Th
-Motor-For-Main-Compressor-As-Per-Rdso-Spec.-No.--E10/3/09-(motor)-With-Amendment-Nos.--01-To-06,clw-Spec.-No.-clw/es/3/0100-(alt.-e)-.-[-Warranty-Period:-30-Months-After-Th>2025-06-02
-Oil-Pump-Complete-With-Motor-For-Transformer-(wound-With-Corona-Resistance-Wire)-As-Per-Clw-Spec.no.-Clw/es/3/0106-Alt-f-Or-Latest-And-Rdso-Specification-No.-Rdso/spec/e-10/03/09-(motor>India -Oil-Pump-Complete-With-Motor-For-Transformer-(wound-With-Corona-Resistance-Wire)-As-Per-Clw-Spec.no.-Clw/es/3/0106-Alt-f-Or-Latest-And-Rdso-Specification-No.-Rdso/spec/e-10/03/09-(motor>Tender Invited For Oil Pump Complete With Motor For Transformer
Oil Pump Complete With Motor For Transformer (wound With Corona Resistance Wire) As Per Clw Spec.no. Clw/es/3/0106 Alt-f Or Latest And Rdso Specification No. Rdso/spec/e 10/03/09 (motor
-Oil-Pump-Complete-With-Motor-For-Transformer-(wound-With-Corona-Resistance-Wire)-As-Per-Clw-Spec.no.-Clw/es/3/0106-Alt-f-Or-Latest-And-Rdso-Specification-No.-Rdso/spec/e-10/03/09-(motor>2025-06-02
Whats app