Filter Search


Energy,-Power-and-Electrical


Location Summary Deadline
-Supply-And-Installation-Of-Mcb/mccb-Testing-Kit-With-Dual-Mode-Outputs-I.e-Mode-No.--01)--0.01-To-100-Amps-Ac-For-Mcbs-Mode-No.--02)-100a-To-2000a-Ac-For-Mccbs.-Make-:--R-K-Industrie>India -Supply-And-Installation-Of-Mcb/mccb-Testing-Kit-With-Dual-Mode-Outputs-I.e-Mode-No.--01)--0.01-To-100-Amps-Ac-For-Mcbs-Mode-No.--02)-100a-To-2000a-Ac-For-Mccbs.-Make-:--R-K-Industrie>Tender Invited For Supply And Installation Of Mcb/mccb Testing Kit
Supply And Installation Of Mcb/mccb Testing Kit With Dual Mode Outputs I.e Mode No.- 01) -0.01 To 100 Amps Ac For Mcbs Mode No.- 02) 100a To 2000a Ac For Mccbs. Make :- R K Industrie
-Supply-And-Installation-Of-Mcb/mccb-Testing-Kit-With-Dual-Mode-Outputs-I.e-Mode-No.--01)--0.01-To-100-Amps-Ac-For-Mcbs-Mode-No.--02)-100a-To-2000a-Ac-For-Mccbs.-Make-:--R-K-Industrie>2025-05-29
-Supply-Of-01-No.-Self-Priming-Centrifugal-Monoblock-Pump-Motor-Set,-2hp,-3-Phase,-Head--20meter,-Suction-50mm,-Delivery-40-Mm-With-01-No.-2-Hp-Starter,-50-Mm-S>India -Supply-Of-01-No.-Self-Priming-Centrifugal-Monoblock-Pump-Motor-Set,-2hp,-3-Phase,-Head--20meter,-Suction-50mm,-Delivery-40-Mm-With-01-No.-2-Hp-Starter,-50-Mm-S>Tender Invited For Supply Of 01 No. Self Priming Centrifugal Monoblock Pump Motor Set Etc
Supply Of 01 No. Self Priming Centrifugal Monoblock Pump Motor Set, 2hp, 3 Phase, Head- 20meter, Suction 50mm, Delivery 40 Mm With 01 No. 2 Hp Starter, 50 Mm S
-Supply-Of-01-No.-Self-Priming-Centrifugal-Monoblock-Pump-Motor-Set,-2hp,-3-Phase,-Head--20meter,-Suction-50mm,-Delivery-40-Mm-With-01-No.-2-Hp-Starter,-50-Mm-S>2025-05-29
-Supply-Of-01-No.-Self-Priming-Centrifugal-Monoblock-Pump-Motor-Set-5hp,-3-Phase,-Head--20-Meter,-Suction-80mm,-Delivery-80-Mm-With-01-No.-5-Hp-Starter,-8>India -Supply-Of-01-No.-Self-Priming-Centrifugal-Monoblock-Pump-Motor-Set-5hp,-3-Phase,-Head--20-Meter,-Suction-80mm,-Delivery-80-Mm-With-01-No.-5-Hp-Starter,-8>Tender Invited For Supply Of 01 No. Self Priming Centrifugal Monoblock Pump Motor Set 5hp & Etc
Supply Of 01 No. Self Priming Centrifugal Monoblock Pump Motor Set 5hp, 3 Phase, Head- 20 Meter, Suction 80mm, Delivery 80 Mm With 01 No. 5 Hp Starter, 8
-Supply-Of-01-No.-Self-Priming-Centrifugal-Monoblock-Pump-Motor-Set-5hp,-3-Phase,-Head--20-Meter,-Suction-80mm,-Delivery-80-Mm-With-01-No.-5-Hp-Starter,-8>2025-05-29
India Construction of new administrative building for accommodation of O&M Division office Bhusawal at 33/11 KV S/Stn Chorwad Tal. Bhusawal Dist. Jalgaon 2025-05-29
-Earth-Fitting-Work.-
-Renovation-Of-Community-Building.>India
-Earth-Fitting-Work.-
-Renovation-Of-Community-Building.>Construction Of Underground Drain, Pcc Road, Paver Block Road, Rcc Drain, Hume Pipe Drain, Library.
Earth Fitting Work.
Renovation Of Community Building.
-Earth-Fitting-Work.-
-Renovation-Of-Community-Building.>2025-05-29
India Construction Of New Building For Accommodation Of A) O&m Division Office Savada & B) Meter Testing Unit Savada At Msedcl’s Filter Unit Savada Premises Tal. Raver Dist. Jalgaon 2025-05-29
-Set-Of-Spares-For-Maintenance-Of-M&p-As-Per-Annexure-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-]-]>India -Set-Of-Spares-For-Maintenance-Of-M&p-As-Per-Annexure-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-]-]>Tender Invited For Set Of Spares For Maintenance Of M&p As [set Of Spares For Maintenance Of M&p As Per Annexure]
Set Of Spares For Maintenance Of M&p As Per Annexure [ Warranty Period: 30 Months After The Date Of Delivery ] ]
-Set-Of-Spares-For-Maintenance-Of-M&p-As-Per-Annexure-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-]-]>2025-05-29
-Led-Light-Fitting-For-Corridor,-Doorway,-Gangway,-Passenger-Area-(cabin)-Of-Non-Ac-Lhb-Coaches,-Type-B-1,-9-Watts-As-Per-Rcf>India -Led-Light-Fitting-For-Corridor,-Doorway,-Gangway,-Passenger-Area-(cabin)-Of-Non-Ac-Lhb-Coaches,-Type-B-1,-9-Watts-As-Per-Rcf>Tender Invited For Led Light Fitting For Corridor, Doorway, Gangway, Passenger Area (cabin) Of Non Ac Lhb Coaches, Type B-1
Led Light Fitting For Corridor, Doorway, Gangway, Passenger Area (cabin) Of Non Ac Lhb Coaches, Type B-1, 9 Watts As Per Rcf
-Led-Light-Fitting-For-Corridor,-Doorway,-Gangway,-Passenger-Area-(cabin)-Of-Non-Ac-Lhb-Coaches,-Type-B-1,-9-Watts-As-Per-Rcf>2025-05-29
India Rate Contract For The Supply Of Stationery And Other Items In Najarat -, , Sealing Wax Stick Camel/cores/high-quality Branded, Dispatch Register 8" X 6" Plastic Cover With 100 Pages Of High-quality Paper, Spiral Notebook 8.6" X 5.3" With 100 Pages Of High 2025-05-29
India Drilling Of New Borewell And Fixing Of Motor Pump Set Cable And Panal Board Work At Ward No 16 And Ward No 8 In Arakalagud Town Lilmit 2025-05-29
Whats app