Filter Search


Energy,-Power-and-Electrical


Location Summary Deadline
India 1ph Relay Testing Kit Suitable For Testing Protection Relays Used In Ac Traction substations As Per Rdso Spec Ti/spc/psi/testkit/1080(12/2018) With A And C slip No.1 Or Latest Rev. With Std Accessories Warranty Upto 30months. Make megger, Scope ,dobel, Ki 2025-08-25
China No.2023g55 Plot Power Access Project 2025-08-25
India Supply Of Lt Shackle Hardware ,2.0 ,supply Of Supply Of Lt Shackle Hardware ,supply Of Lt Shackle Hardware 2025-08-25
India Set Of Brush Holder Revolving Ring Complete With Brush Holder For Hitachi Tm. specn.- Drg.no. 10q.750.249, Rev.h & 10q.750.320,rev.h With Rdso modification No. Wag 5 - 27 And 28. .#* Set Of Brush Holder Revolving Ring Complete With Brush Holder For Hitach 2025-08-25
India Modification Kit For Provision Of Trap Chamber In Bp Line Of Ccb 2.0 .#* Modification Kit For Provision Of Trap Chamber In Bp Line Of Ccb 2.0 Version Hhp Locomotives As Per Rdso Mod. Sheet No. Mp.mod.bk.01.03.21 (rev.00) Dtd- 23.03.2021. One Kit Consistin 2025-08-25
India Latching Push Botton Corridor Lighting As Per Clw Spec. No. clw/es/3/0044, Clw Drg. No. Clw/es/3/sk-1/0044 (abb Document No. hbtb585456r0102) .#* Latching Push Botton Corridor Lighting As Per Clw Spec. No. Clw/es/3/0044, clw Drg. No. Clw/es/3/sk-1/0044 (a 2025-08-25
India Lube Oil Valvoline Premium Blue 8600, Grade 15w40 Ck4. .#* Lube Oil Valvoline Premium Blue 8600, Grade 15w40 Ck4 For Cpcb Iv Compliant Cummins Make Dg Sets Used In Lhb power Cars. [ Warranty Period: 6 Months After The Date Of Delivery ] ] 2025-08-25
India Supply And Installation Of Equipments At Government Siddha Medical College, Chennai ,2.0 ,supply And Installation Of Equipments At Government Siddha Medical College, Chennai ,pasteur Pipette ,porcelain Kalvam ,thaptha Kalvam ,distillation Apparatus ,adupp 2025-08-25
-Construction-Of-33/-11-Kv-S/s-At-Bansthuni-Along-With-Their-33-Kv-Lines-And-11-Kv-Interconnections-Under-Aen(onm)-Jpd,-Kishanganj-On-Labourrate-Of-Arc-2025-Basis-Under-Tn-26/2025-26-In-The-Jurisdiction-Of-Barancircle-Of-Jaipur-Discom-O>India -Construction-Of-33/-11-Kv-S/s-At-Bansthuni-Along-With-Their-33-Kv-Lines-And-11-Kv-Interconnections-Under-Aen(onm)-Jpd,-Kishanganj-On-Labourrate-Of-Arc-2025-Basis-Under-Tn-26/2025-26-In-The-Jurisdiction-Of-Barancircle-Of-Jaipur-Discom-O>Tn-26/2025-26
Construction Of 33/ 11 Kv S/s At Bansthuni Along With Their 33 Kv Lines And 11 Kv Interconnections Under Aen(onm) Jpd, Kishanganj On Labourrate Of Arc-2025 Basis Under Tn-26/2025-26 In The Jurisdiction Of Barancircle Of Jaipur Discom O
-Construction-Of-33/-11-Kv-S/s-At-Bansthuni-Along-With-Their-33-Kv-Lines-And-11-Kv-Interconnections-Under-Aen(onm)-Jpd,-Kishanganj-On-Labourrate-Of-Arc-2025-Basis-Under-Tn-26/2025-26-In-The-Jurisdiction-Of-Barancircle-Of-Jaipur-Discom-O>2025-08-25
-Creation-Of-33/-11-Kv-S/s-At-Katikhandi-Along-With-Its-33-Kv-Line-And-11kv-Interconnections-Under-Aen(onm)-Jpd,-Chhabra-On-Labour-Rate-Ofarc-2025-Basis-Under-Tn-28/2025-26-In-The-Jurisdiction-Of-Baran-Circle-Of-Jaipur-Discom-On-Arc-202>India -Creation-Of-33/-11-Kv-S/s-At-Katikhandi-Along-With-Its-33-Kv-Line-And-11kv-Interconnections-Under-Aen(onm)-Jpd,-Chhabra-On-Labour-Rate-Ofarc-2025-Basis-Under-Tn-28/2025-26-In-The-Jurisdiction-Of-Baran-Circle-Of-Jaipur-Discom-On-Arc-202>Tn-28/2025-26
Creation Of 33/ 11 Kv S/s At Katikhandi Along With Its 33 Kv Line And 11kv Interconnections Under Aen(onm) Jpd, Chhabra On Labour Rate Ofarc-2025 Basis Under Tn-28/2025-26 In The Jurisdiction Of Baran Circle Of Jaipur Discom On Arc-202
-Creation-Of-33/-11-Kv-S/s-At-Katikhandi-Along-With-Its-33-Kv-Line-And-11kv-Interconnections-Under-Aen(onm)-Jpd,-Chhabra-On-Labour-Rate-Ofarc-2025-Basis-Under-Tn-28/2025-26-In-The-Jurisdiction-Of-Baran-Circle-Of-Jaipur-Discom-On-Arc-202>2025-08-25
Whats app