Filter Search


Energy,-Power-and-Electrical


Location Summary Deadline
Morocco Connection Of The Future Photovoltaic Center In The Hta Network Of The City Of Jerada (province Of Jerada) 2025-08-26
South Africa The Execution Of The Civils Works For The Hvdc Test Facility At Apollo Site For A Period Of Twelve (12) Months 2025-08-26
Morocco Power Increase Works Of 2x40 Mva To 3x40 Mva At Oujda Post 225/60/22kv (oujda Prefecture - Angad) 2025-08-26
Germany 2 Power Producers For Fireworks Willingen And Usseln 2025-08-26
Philippines Invitation To Offer For Proposed Submersible Solar Water System Project In Barangay Manorigao 2025-08-26
Germany Routing To Kalamity At Fbb Schanze And Fbb Glindfeld 2025-08-26
Morocco Supply Of Hta/bt Cable Accessories For The Name Of Srm-ori 2025-08-26
India Set Of Insulator (top & Bottom) A3, A4, A5, A6 Porcelain Part Only .#* Set Of Insulator (top & Bottom) A3, A4, A5, A6 Porcelain Part Only (consisting Of 4nos/ Set) Fitted In 5400 Kva Loco Main Transformer As Per Drawing No. Kgp/el-811 [ Warranty Period: 3 2025-08-26
India Trip Indication Fuse Suitable For Rsi Of Wag- 5/wag-7/wap-4 Electric locomotive .#* Trip Indication Fuse (tell Tale Fuse) Ti-2000 ( Gsl-2000) Of Ge Or Eaton (bussman) type Ti-2000 Bi Suitable For Rsi Of Wag- 5/wag-7/wap-4 Electric Locomotive . [ Warranty 2025-08-26
India 25 Kv Gapless Surge Arrester (la) .#* 25 Kv Gapless Surge Arrester (la) As Per Clw Specification No. Clw/es/a-12, Alt- D Or Latest For conventional Electric Locos [ Warranty Period: 30 Months After The Date Of Delivery ] [quantity Tolerance (+/-): 5 %age 2025-08-26
Whats app