Filter Search


Energy,-Power-and-Electrical


Location Summary Deadline
India Annual Plan-129/2025-26-sulthan Bathery Municipality Chettimoola Thenmala Road Re Tarring Division -27, Annual Plan-129/2025-26-sulthan Bathery Municipality:chettimoola Thenmala Road Re Tarring;division -27-general Civil Work, 4.9:wet Mix Macadam <br&g 2025-08-25
India Panjal Gp 2025-26 Thiruvanjikkuzhi Road Restoration In Ward 1, Annual Plan-panjal Gp 2025-26 Thiruvanjikkuzhi Road Restoration In Ward 1-project No: 150/26-general Civil Work, 3.5.1:excavation In Cutting In Soil By Manual Means With Lead Upto 50 M Excavat 2025-08-25
India Annual Plan-171/2025-26-sulthan Bathery Municipality Kuttyali Memmorial Road Re Tarring Division -26, Annual Plan-171/2025-26-sulthan Bathery Municipality: Kuttyali Memmorial Road Re Tarring; Division -26-general Civil Work, 4.9:wet Mix Macadam <br> 2025-08-25
India Panjal Gp 2025-26 Chathanathupadi Canal Bund Road Restoration In Ward 1, Annual Plan-panjal Gp 2025-26 Chathanathupadi Canal Bund Road Restoration In Ward 1-project No: 155/26-general Civil Work, 3.5.1:excavation In Cutting In Soil By Manual Means With Le 2025-08-25
India Panjal Gp 2025-26 Kattilkavu Parakkal Road Restoration In Ward 14, Annual Plan-panjal Gp 2025-26 Kattilkavu Parakkal Road Restoration In Ward 14-project No: 156/26-general Civil Work, 3.5.1:excavation In Cutting In Soil By Manual Means With Lead Upto 50 M 2025-08-25
India Annual Plan-173/2025-26-sulthan Bathery Municipality Balance Portion Tarring At Poothikkadu Chettimoola Road Division-28, Annual Plan-173/2025-26-sulthan Bathery Municipality: Balance Portion Tarring At Poothikkadu Chettimoola Road; Division-28-general Ci 2025-08-25
India Annual Plan-project No_263/20256-26-construction Of Drainage At Kaippanchery Maithanikkunnu Road, Annual Plan-project No:263/20256-26-construction Of Drainage At Kaippanchery Maithanikkunnu Road-rs.2.00 Lakh (cfc)-general Civil Work, Construction Of Drain 2025-08-25
India Panjal Gp 2025-26 Koranthodi Sanketham Sub Road Retarring In Ward 2, Annual Plan-panjal Gp 2025-26 Koranthodi Sanketham Sub Road Retarring In Ward 2-project No: 29/26-general Civil Work, 75.5.2.3pb:tack Coat - With Packed Bitumen Rates Providing And Apply 2025-08-25
India Annual Plan-242/2025-26-sulthan Bathery Municipality Vikas Road Balance Portion Concrete Division - 25, Annual Plan-242/2025-26-sulthan Bathery Municipality:vikas Road Balance Portion Concrete, Division - 25-general Civil Work, Od168433/2025-2026:surface 2025-08-25
India Annual Plan-245/2025-26-sulthan Bathery Municipality Re-tarring Starting At Chettimoola Poothikkadu Road Division-28, Annual Plan-245/2025-26-sulthan Bathery Municipality: Re-tarring Starting At Chettimoola Poothikkadu Road;division-28-general Civil Work, 2025-08-25
Whats app