Filter Search


Energy,-Power-and-Electrical


Location Summary Deadline
India Providing. Supplying Of Led 70 Watt Of Different Weds. File No. 153/25x6/4 2026-01-16
India Providing, Supplying Of Led 70 Watt Of Ward 64, File No. 162/25x6/4 2026-01-16
-Drilling-Installation-Of-150-Mm-Dia-.new-Light-Duty-Tube-Well-Solar-As-Atgachia-Varkhanda-Ldtw-Cluster-(3-Nos.)-At-Satgachia-Mouza-In-Jl>India -Drilling-Installation-Of-150-Mm-Dia-.new-Light-Duty-Tube-Well-Solar-As-Atgachia-Varkhanda-Ldtw-Cluster-(3-Nos.)-At-Satgachia-Mouza-In-Jl>Drilling Installation Of 150 Mm Dia .new Light Duty Tube Well Solar As Atgachia Varkhanda Ldtw Cluster (3 Nos.)
Drilling Installation Of 150 Mm Dia .new Light Duty Tube Well Solar As Atgachia Varkhanda Ldtw Cluster (3 Nos.) At Satgachia Mouza In Jl
-Drilling-Installation-Of-150-Mm-Dia-.new-Light-Duty-Tube-Well-Solar-As-Atgachia-Varkhanda-Ldtw-Cluster-(3-Nos.)-At-Satgachia-Mouza-In-Jl>2026-01-16
-Installation-Of-1-No-Ldtw-(solar)-(depth-100m)-With-Pvc-Pipe-At-Pondali(4nos)-(j.l.-No.---221)-Within-Burdwan-(a-i)-Sub--Division-In-Kota-G.p.,ausgram-ii-Block,-Plot-No--1>India -Installation-Of-1-No-Ldtw-(solar)-(depth-100m)-With-Pvc-Pipe-At-Pondali(4nos)-(j.l.-No.---221)-Within-Burdwan-(a-i)-Sub--Division-In-Kota-G.p.,ausgram-ii-Block,-Plot-No--1>Installation Of 1 No Ldtw (solar) (depth 100m) With Pvc Pipe At Pondali(4nos)
Installation Of 1 No Ldtw (solar) (depth 100m) With Pvc Pipe At Pondali(4nos) (j.l. No. - 221) Within Burdwan (a-i) Sub- Division In Kota G.p.,ausgram-ii Block, Plot No -1
-Installation-Of-1-No-Ldtw-(solar)-(depth-100m)-With-Pvc-Pipe-At-Pondali(4nos)-(j.l.-No.---221)-Within-Burdwan-(a-i)-Sub--Division-In-Kota-G.p.,ausgram-ii-Block,-Plot-No--1>2026-01-16
-Construction-Of-Solar-Operated-Pump-Dug-well-(pdw)-(4nos.)-At-Mouza--Sahabazar,-Jl-No-182,-Plot-No-374,-393,-354-And-369-G.p.--Nagari-Under-Suri-i-Dev.-Block-Within-Birbh>India -Construction-Of-Solar-Operated-Pump-Dug-well-(pdw)-(4nos.)-At-Mouza--Sahabazar,-Jl-No-182,-Plot-No-374,-393,-354-And-369-G.p.--Nagari-Under-Suri-i-Dev.-Block-Within-Birbh>Construction Of Solar Operated Pump Dug-well (pdw) (4nos.) At Mouza- Sahabazar
Construction Of Solar Operated Pump Dug-well (pdw) (4nos.) At Mouza- Sahabazar, Jl No-182, Plot No-374, 393, 354 And 369 G.p.- Nagari Under Suri-i Dev. Block Within Birbh
-Construction-Of-Solar-Operated-Pump-Dug-well-(pdw)-(4nos.)-At-Mouza--Sahabazar,-Jl-No-182,-Plot-No-374,-393,-354-And-369-G.p.--Nagari-Under-Suri-i-Dev.-Block-Within-Birbh>2026-01-16
-Drilling-Installation-Of-150-Mm-Dia.new-Light-Duty-Tube-Well-Solar-As-Goaldingi-1-Ldtw-Cluster-(4-Nos.)-At-Goaldingi-Mouza-In-Jl-No-102-On-Plot-N>India -Drilling-Installation-Of-150-Mm-Dia.new-Light-Duty-Tube-Well-Solar-As-Goaldingi-1-Ldtw-Cluster-(4-Nos.)-At-Goaldingi-Mouza-In-Jl-No-102-On-Plot-N>Drilling Installation Of 150 Mm Dia.new Light Duty Tube Well Solar As Goaldingi-1 Ldtw Cluster (4 Nos.)
Drilling Installation Of 150 Mm Dia.new Light Duty Tube Well Solar As Goaldingi-1 Ldtw Cluster (4 Nos.) At Goaldingi Mouza In Jl No 102 On Plot N
-Drilling-Installation-Of-150-Mm-Dia.new-Light-Duty-Tube-Well-Solar-As-Goaldingi-1-Ldtw-Cluster-(4-Nos.)-At-Goaldingi-Mouza-In-Jl-No-102-On-Plot-N>2026-01-16
India Creation Of 100kva Sub Station At Material Facilities (mrf) Plant Verinag 2026-01-16
India Creation Of 100kva Sub Station At Material Facilities (mrf) Plant Dooru Mandipora 2026-01-16
India Shifting And Erection Of 3ph 3w 11kv, 3p4w Lt Line And Sub-station Due To Widening And Strengthening Of Handapa Patrapada Road From 0.0km To 20.0 Km For The Year 2025-26. 2026-01-16
India Shifting And Erection Of 3ph 3w 11kv, 3p4w Lt Line And Sub-station Due To Widening And Strengthening Of Parsumal Kishorenagar Road From 0.0km To 22.0km Fot The Year 2025-26. 2026-01-16
Whats app