Filter Search


Energy,-Power-and-Electrical


Location Summary Deadline
India (cm Monit) Construction Work Of C.c. Road And Drain Work From Hanuman Talkies Dal Bati Shop To Pan Patte Ki Goth, Ward No. 53 Zone 20 File No. 664/25x3/6. 2026-01-19
India (cm Infra) Construction Of Community Hall At Bam Bhole Ki Bagiya Zone No. 02 Ward 06. File No. 279/25x3/3. 2026-01-19
India Service For Complete Repair Of Tac 1 Motor Including Rewinding Work Bearing Replacement Work Both De And Nde Branded Skf Bearing Painting Of Motor 2026-01-19
-Construction-Of-2-Nos-Drain-At-Booth-No-135-(scheme-Id--Apas/01/188/135/0004-And-Apas/01/188/135/0005)-At-Nasibpur-Gp-Within-Singur-Dev-Block.>India -Construction-Of-2-Nos-Drain-At-Booth-No-135-(scheme-Id--Apas/01/188/135/0004-And-Apas/01/188/135/0005)-At-Nasibpur-Gp-Within-Singur-Dev-Block.>Memo 4774 Sl 1
Construction Of 2 Nos Drain At Booth No 135 (scheme Id- Apas/01/188/135/0004 And Apas/01/188/135/0005) At Nasibpur Gp Within Singur Dev Block.
-Construction-Of-2-Nos-Drain-At-Booth-No-135-(scheme-Id--Apas/01/188/135/0004-And-Apas/01/188/135/0005)-At-Nasibpur-Gp-Within-Singur-Dev-Block.>2026-01-19
-Installation-Of-2-Nos-Shade-At-Booth-No-145-(scheme-Id--Apas/01/188/145/0008-And-Apas/01/188/145/0009)-At-Nasibpur-Gp-Within-Singur-Dev-Block.>India -Installation-Of-2-Nos-Shade-At-Booth-No-145-(scheme-Id--Apas/01/188/145/0008-And-Apas/01/188/145/0009)-At-Nasibpur-Gp-Within-Singur-Dev-Block.>Memo 4774 Sl 15
Installation Of 2 Nos Shade At Booth No 145 (scheme Id- Apas/01/188/145/0008 And Apas/01/188/145/0009) At Nasibpur Gp Within Singur Dev Block.
-Installation-Of-2-Nos-Shade-At-Booth-No-145-(scheme-Id--Apas/01/188/145/0008-And-Apas/01/188/145/0009)-At-Nasibpur-Gp-Within-Singur-Dev-Block.>2026-01-19
-Installation-Of-5-Nos-High-Mast-Light-At-Booth-No-135-(scheme-Id--Apas/01/188/135/0006-And-Apas/01/188/135/0007,-Apas/01/188/135/0008,-Apas/01/188/135/0009,-Apas/01/188/135/0010)-At-Nasibpur-Gp-Within-Singur-Dev-Block.>India -Installation-Of-5-Nos-High-Mast-Light-At-Booth-No-135-(scheme-Id--Apas/01/188/135/0006-And-Apas/01/188/135/0007,-Apas/01/188/135/0008,-Apas/01/188/135/0009,-Apas/01/188/135/0010)-At-Nasibpur-Gp-Within-Singur-Dev-Block.>Memo 4774 Sl 2
Installation Of 5 Nos High Mast Light At Booth No 135 (scheme Id- Apas/01/188/135/0006 And Apas/01/188/135/0007, Apas/01/188/135/0008, Apas/01/188/135/0009, Apas/01/188/135/0010) At Nasibpur Gp Within Singur Dev Block.
-Installation-Of-5-Nos-High-Mast-Light-At-Booth-No-135-(scheme-Id--Apas/01/188/135/0006-And-Apas/01/188/135/0007,-Apas/01/188/135/0008,-Apas/01/188/135/0009,-Apas/01/188/135/0010)-At-Nasibpur-Gp-Within-Singur-Dev-Block.>2026-01-19
-Installation-Of-2-Nos-Shade-At-Booth-No-148-(scheme-Id--Apas/01/188/148/0007-And-Apas/01/188/148/0011)-At-Nasibpur-Gp-Within-Singur-Dev-Block.>India -Installation-Of-2-Nos-Shade-At-Booth-No-148-(scheme-Id--Apas/01/188/148/0007-And-Apas/01/188/148/0011)-At-Nasibpur-Gp-Within-Singur-Dev-Block.>Memo 4774 Sl 24
Installation Of 2 Nos Shade At Booth No 148 (scheme Id- Apas/01/188/148/0007 And Apas/01/188/148/0011) At Nasibpur Gp Within Singur Dev Block.
-Installation-Of-2-Nos-Shade-At-Booth-No-148-(scheme-Id--Apas/01/188/148/0007-And-Apas/01/188/148/0011)-At-Nasibpur-Gp-Within-Singur-Dev-Block.>2026-01-19
-Construction-Of-Shed-At-Kazipara-Molla-Simla-Snan-Ghat-At-Nasibpur-Gp-Within-Singur-Dev-Block.>India -Construction-Of-Shed-At-Kazipara-Molla-Simla-Snan-Ghat-At-Nasibpur-Gp-Within-Singur-Dev-Block.>Memo 4774 Sl 25
Construction Of Shed At Kazipara Molla Simla Snan Ghat At Nasibpur Gp Within Singur Dev Block.
-Construction-Of-Shed-At-Kazipara-Molla-Simla-Snan-Ghat-At-Nasibpur-Gp-Within-Singur-Dev-Block.>2026-01-19
-Construction-Of-Community-Centers-Nasibpur-Raspara-Groundat-Nasibpur-Gp-Within-Singur-Dev-Block.>India -Construction-Of-Community-Centers-Nasibpur-Raspara-Groundat-Nasibpur-Gp-Within-Singur-Dev-Block.>Memo 4774 Sl 3
Construction Of Community Centers Nasibpur Raspara Groundat Nasibpur Gp Within Singur Dev Block.
-Construction-Of-Community-Centers-Nasibpur-Raspara-Groundat-Nasibpur-Gp-Within-Singur-Dev-Block.>2026-01-19
-Installation-Of-Led-Light-At-150-No-Booth-Area-50-Nosnasibpur-Gp-Within-Singur-Dev-Block.>India -Installation-Of-Led-Light-At-150-No-Booth-Area-50-Nosnasibpur-Gp-Within-Singur-Dev-Block.>Memo 4774 Sl 30
Installation Of Led Light At 150 No Booth Area 50 Nosnasibpur Gp Within Singur Dev Block.
-Installation-Of-Led-Light-At-150-No-Booth-Area-50-Nosnasibpur-Gp-Within-Singur-Dev-Block.>2026-01-19
Whats app