Filter Search


Energy,-Power-and-Electrical


Location Summary Deadline
India Provn Of Deficient 100 Dus At Af Stn Sarsawa Phase I Sch A Part I For Bldgs Wks On Epc Mode 2025-12-15
India Supply Of Non-deteriorating Fuse As Per Details....etc .#* Supply Of Non-deteriorating Fuse As Per Details Attached In Annexure-a. [ Warranty Period : 30 Months After The Date Of Delivery ] ] 2025-12-15
India Design, Installation, Supply, Civil Works, Construction, Testing, Commissioning Of 500 Kw On-grid Solar Photovoltaic Trees Including Comprehensive Annual Maintenance Contract (camc) For A Period Of 05 Years 2025-12-15
India Main Compressor Complete Assembly With Driving Motor Mcp .#* Main Compressor Complete Assembly With Driving Motor Mcp (make:- Abb,cro mpton, Bbl) For Conventional Electric Loco 1000 Lpm As Per Clws Spec.no - Clw/es/c-34(a lt-o) Including Latest Ms/tc Issu 2025-12-15
India Tender Invited For Weldcut Two Stage Two Gauge Nitrogen Regulator ( Outlet Pressure 10 Bar) Model 42 Series , Weldcut Spare Repair Kit 423441 Of Model 42 Series , Weldcut Single Stage Two Gauge Nitrogen Reg Bni 6100 High Pressure , Weldcut Spare Repair Ki 2025-12-15
India Supply Of Medium Class Gi Pipes 100 Mm Dia (4.5 Mm Thickness)....etc .#* Supply Of Medium Class Gi Pipes 100 Mm Dia (4.5 Mm Thickness) As Per Is 1239 (part 1): 200 4 Or Latest With Socket & Coupling On Culverts Bridges Or At Any Other Locations As Decided 2025-12-15
India Tender Invited For Lv7-t-815 10315344 443-612-015-807 Air Pressure Governer , Lv7-t-815 10322302 993-050-480-0 Ring Compression Piston 1st Ring , Lv7-t-815 4x4 10327554 443-441-035-000 Speedometer Drive , Lv7-hmv-8x8-al- Sv 10558569 B9802001 Injector , Lv 2025-12-15
India Name Of The Work :- Ohe Work For Eliminate Dn Main Cum Up Loop Facility By provision Of Up Loop Line And Island Pass. Platform At Garbeta (gba) Station. 2025-12-15
India Circuit Board For Knorr Bremse Make Air Dryer, Suitable For 3 Phase Ac Emu To Kb part No. Stn21386/1102. .#* Circuit Board For Knorr Bremse Make Air Dryer, Suitable For 3 Phase Ac Emu To Kb Part No. St n21386/1102. [ Warranty Period: 30 Months After The D 2025-12-15
India Supply Installation And Commissioning Of Vacuum Exhauster Plant. .#* Supply Installation And Commissioning Of Vacuum Exhauster Plant Complete Set With Motor A s Per Attached Specifications. [ Warranty Period: 30 Months After The Date Of Delivery ] ] 2025-12-15
Whats app