Filter Search


Energy,-Power-and-Electrical


Location Summary Deadline
India Condensor Fan Motor .#* Condensor Fan Motor For Sidwal/inteel/fedders Lloyed Make Rmpu For Lhb Type Ac Coaches 0.75 K w, 415 V, 3 Phase, 50 Hz, 1500 Rpm Frame Size: Qupc 80m4b (foot Mounted) Of M/s Abb, Rdso/pe/spec/ac/0089, Rev.- 0/2008 With Amdt. No.1,2 2025-12-18
India Supply Of Red Aspect, Main Led Signal Lighting Unit, 110vac, Retrofittable In Existing Cls Housing And Compatible With Ac Led Ecr As Per Specification No. Rdso/spn/199/2025/rev.1.2 With Amendment-1. [ Warranty Period: 60 Months After The Date Of Delivery 2025-12-18
Turkey Reactive Power Compensation Systems Business 2025-12-18
Spain The Objective Of This Project Is To Carry Out The Definition Of The Necessary Actions To Execute The Installations And Distribution Modifications That Allow The Implementation Of The Gsc In The Sscna Building Of The Acc Of Enaire In Torrejón De Ardoz. 2025-12-18
Japan Complete Set Of Gas Used At Tottori University Miura Danchi 2025-12-18
Jordan Tender 162-2025 Electrical Supplies 2025-12-18
Turkey Reactive Power Compensation Systems Tender 2025-12-18
India Blank Key (bl Key), A Part Of Cab Activating Switch Type Ss-s-b-r Kaba 3 Positions C- o-d 15a, 500v As Per Clw Specn. No.clw/es/3/0074 For 3 Phase Locos .#* Blank Key (bl Key), A Part Of Cab Activating Switch Type Ss-s-b-r Kaba 3 Positions C-o-d 15a , 500 2025-12-18
India Construction Of Samrat Ashok Bhawan In Nagar Parishad Sahebganj. 2025-12-18
India Supply Of Traction Motor Blower With Motor As Per Clw's Specn. No. Clw/es/3/0019, (alt.- G) For Wag9 Type Electric Locos [ Warranty Period: 30 Months After The Date Of Delivery ] ] 2025-12-18
Whats app